Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-4 of 4
Keywords: shut-in period
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Production and Operations Symposium, March 23–26, 2013
Paper Number: SPE-164473-MS
.... In this paper a reservoir-performance based algorithm proposed by Ozkan et al. (2003) is applied to optimize the gas production and shut-in periods of plunger lift operation. The objective of the optimization is to maximize gas production with the condition that the liquid loaded during production can...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Production and Operations Symposium, March 23–25, 2003
Paper Number: SPE-80891-MS
... at the bottom of the tubing by the end of the shut-in period. Setting the well’s controller to have the shortest possible shut-in time period to allow the plunger to fall to bottom can maximize oil and gas production from plunger lift installations. microphone recess plunger lift installation data...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Production Operations Symposium, April 7–9, 1991
Paper Number: SPE-21708-MS
... the pressure drawdown. The pressure buildup testing theory was derived from the pressure drawdown theory described above. By definition, a pressure buildup test consists of two parts; the drawdown (flow) and shut-in periods. Traditionally, the equations defining a buildup test were derived using...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Production Operations Symposium, April 7–9, 1991
Paper Number: SPE-21650-MS
... parameters in the model were determined by regression. These parameters were then used in the radial model to simulate cases of practical importance. The radial model describes gelation behavior during the period of gel solution injection and the subsequent shut-in period. During the injection phase...