1-4 of 4
Keywords: shut-in period
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 23–26, 2013
Paper Number: SPE-164473-MS
.... In this paper a reservoir-performance based algorithm proposed by Ozkan et al. (2003) is applied to optimize the gas production and shut-in periods of plunger lift operation. The objective of the optimization is to maximize gas production with the condition that the liquid loaded during production can...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 23–25, 2003
Paper Number: SPE-80891-MS
... at the bottom of the tubing by the end of the shut-in period. Setting the well’s controller to have the shortest possible shut-in time period to allow the plunger to fall to bottom can maximize oil and gas production from plunger lift installations. microphone recess plunger lift installation data...
Proceedings Papers

Paper presented at the SPE Production Operations Symposium, April 7–9, 1991
Paper Number: SPE-21708-MS
... the pressure drawdown. The pressure buildup testing theory was derived from the pressure drawdown theory described above. By definition, a pressure buildup test consists of two parts; the drawdown (flow) and shut-in periods. Traditionally, the equations defining a buildup test were derived using...
Proceedings Papers

Paper presented at the SPE Production Operations Symposium, April 7–9, 1991
Paper Number: SPE-21650-MS
... parameters in the model were determined by regression. These parameters were then used in the radial model to simulate cases of practical importance. The radial model describes gelation behavior during the period of gel solution injection and the subsequent shut-in period. During the injection phase...

Product(s) added to cart

Close Modal