1-5 of 5
Keywords: run time
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Oklahoma City Oil and Gas Symposium, April 9–10, 2019
Paper Number: SPE-195186-MS
... proposes an analytical methodology that consists of evaluation of the particle size distribution, viability for the use of sand screens and centrifugal separation systems for sand control management in wells with short run time. These systems have proven effective for failure wells that requires a sand...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 1–5, 2015
Paper Number: SPE-173623-MS
... with production of high volumes of solids. This technology allows for increased plunger and barrel run life and has been successfully tested in numerous wells. This paper discusses the details of this new technology and the proven benefits based on field trial results. beam pumping run time particulate...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 23–25, 2003
Paper Number: SPE-80886-MS
... (not considering downtime losses). Thus, the manual rotator is not just for "problem" wells and significantly reduces wear failures. rod guide information upstream oil & gas well integrity riser corrosion rod box circumference installation manual rotator pipeline corrosion run time materials...
Proceedings Papers

Paper presented at the SPE Production and Operations Symposium, March 23–25, 2003
Paper Number: SPE-80924-MS
... by eliminating any gas interference in the pump and controlling pump run time so the pump displacement will match the inflow of liquid from the reservoir into the wellbore. The operator must monitor well to insure that the pump has no mechanical problems and efficient operations are maintained as all...
Proceedings Papers

Paper presented at the SPE Production Operations Symposium, March 1–3, 1981
Paper Number: SPE-9760-MS
... information as a fully automated system at a reduced per well cost. beam pumping computer terminal run time production monitoring well control control equipment dynamometer card control system semi-automated control reservoir surveillance transducer production lease production control...

Product(s) added to cart

Close Modal