1-3 of 3
Keywords: bfpd
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Production Operations Symposium, March 21–23, 1993
Paper Number: SPE-25421-MS
... control productivity index gradient bottomhole pressure bfpd production monitoring well 1 ipr curve society of petroleum engineers installation upstream oil & gas reservoir surveillance beam pumping Society of Petroleum Engineers SPE 25421 Optimizing High-Volume Sucker Rod Lift C.D...
Proceedings Papers

Paper presented at the SPE Production Operations Symposium, April 7–9, 1991
Paper Number: SPE-21667-MS
... and 2 UTILIZATION OF SUBMERSIBLE PUMP SYSTEMS IN SOUTH WESTERN VENEZUELA SPE21667 produced at a rate of 400/500 BPD unti 1 1963. At that time the water cut increased to some 60% and remai ned at thi s 1eve1 for approxi mately 12 years (Figure 4 & 5). At present the well is producing 3500 BFPD with a...
Proceedings Papers

Paper presented at the SPE Production Operations Symposium, April 7–9, 1991
Paper Number: SPE-21663-MS
... 2.73 inches, stroke per minute (SPM) 5 to 30, and barrels fluid per day (bfpd) 100 to 300. Table Development We use diagnostic and predictive models (developed at A & M Univ.) to run a substantial range of cases. Analysis of these results provides information in the form of tables that can be...

Product(s) added to cart

Close Modal