1-20 of 32
Keywords: requirement
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194611-MS
... requirement is minimal, conventional process has several limitation such as space availability, load on structure, frequent monitoring etc., hence may not be suitable for mitigation of H 2 S from processed gas and oil. In this work, an approach is adopted for sweetening of sour gas and sour crude...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194570-MS
... injectors. Secondly injection gas requirement for the process will be fulfilled partly through the recycling of produced gas and rest from free gas production from another pay of the same field. Finally it is examined that current existing facility of gas compression will sufficiently cater the additional...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194674-MS
... how the transient simulations helped to monitor progress, identify and respond quickly to address the challenges during initial start-up operation of the deepwater gas field in Indian east coast. It emphasizes the need for accurate estimation of rich MEG arrival time and the minimum required gas flow...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194663-MS
... Recovery (EOR) methods including thermal, chemical and gas injection which are increasingly being pursued in many fields globally require additional meticulous reservoir surveillance to understand and quantify the effectiveness of the EOR scheme which adds to the value of such projects. Interpretation...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185381-MS
... alternative facilitating technology, focused on providing the required level of specification for the operations, with a reduction in the base cost of the technology, namely Rigless operations. The core technology is presented, with key facilitators. The application of the technology is presented in two case...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185380-MS
... inputs for artificial lift design are seam depth and well productivity, while PCP head and flow rate, down-hole string sizing and motor sizing are the required outputs. To take a case study of PCP system optimization, we have Well – A, where the bottom perforation is at 600 m and the water production...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185620-MS
... concluded that a parallel Well Delivery PGS (WD PGS) Process should be developed based on IOCs' and NOCs' best practices for well delivery, KOC's experience with the PGS Process, and the fit-for-purpose requirements of the concerned KOC stakeholders in all business Directorates. In this paper, we...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185421-MS
... reservoirs. proppant gas production rate hydraulic fracturing friction fracturing fluid Mandapeta field fracturing materials Upstream Oil & Gas frac treatment proppant concentration entry friction completion requirement optimisation society of petroleum engineers optimization...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185385-MS
... sustainable development grid power import condensate module requirement saturation temperature boiler Introduction CIL is an E&P company with its major field of operation located in Rajasthan Block. CIL produces in an average of 200,000 BOEPD of crude oil and 45 MMSCFD of gas. Also...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185358-MS
... infrastructure maintenance setup field development optimization and planning new field development project procurement information management platform digital technology operation Upstream Oil & Gas digital ethics control system requirement automation Implementation Field Development Project...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178086-MS
.... controls and umbilicals selection pipeline future expansion cable umbilical node umbilical size distribution scheme configuration Upstream Oil & Gas communication consideration requirement subsea system distribution philosophy Distribution System subsea field distribution scheme...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178087-MS
... For initial steady state calculations PROSPER software was used to find required gas injection pressure, rate, depth and orifice size as well as gas lift performance of the wells. PIPESIM was used for preliminary hydraulic and thermal performance of the network from subsea wells to topside...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178105-MS
... The design requirements and recommendations for intervention riser systems are defined in API 17G/ISO 13628–7 standards. Most of the operators have their own additional requirements, which need to be addressed during design. A riser system is designed such that no single failure will cause any...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178132-MS
... that transfer the cuttings from the shakers directly to the VCD unit. This paper illustrates that in cases where multiple VCDs are required, the number of units may be optimized with minimal loss in base oil recovery and such optimization may also deliver cost benefits dependent upon drilling activity levels...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178116-MS
.... Such designs have a cascading impact on the material requirement, offshore construction time and overall project cost. The FEA approach is effectively utilised to have an optimized boundary condition i.e. by allowing actual seabed modelling based on bathymetry data at close intervals, pipeline layout...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, March 28–30, 2012
Paper Number: SPE-153414-MS
... reporting. reserves replacement relational database upstream oil & gas asset and portfolio management reserve data database change record reserve change tracking management system requirement spreadsheet data mining reserve category spe 153414 reserve spreadsheet society...