1-20 of 32
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194558-MS
... eliminating mud losses, hence increasing lateral length and reservoir contact. annular pressure drilling formation damage feasibility study UBD operation Upstream Oil & Gas UBD technology assembly four-phase separation system drilling operation completion objective reservoir section...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194565-MS
... productivity of the reservoir. Consequently, a new innovation for completion design in an oil well with a bottom aquifer drive is needed. The author offers a Downhole Water Sink (DWS) system to solve this problem. DWS is a dual completion design innovation where two tubing strings are installed into the well...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194638-MS
..., bypassing flooded region. It is also important to design a robust completion strategy to safeguard the longevity of these wells by curtailing produced water. This approach assists in dramatic increase in production by isolating water charged sections and thereby restricting rise in water production. The...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185367-MS
... Upstream Oil & Gas completion fraction production monitoring free gas intake pressure Efficiency candidate well offshore field installation gas lift well Balancing holes – These holes lower the diffrences in the pressure across the stages and also the loading on the thrust bearings...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185374-MS
...-ft) which was deemed to be uneconomic. The economics for the development of multilayered thick tight gas sands with significant reserves requires selection of completion and stimulation technology to suit the rock petro-physical properties, in-situ stresses and target pay zones. An alternate to...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185366-MS
... Abstract Traditional development of unconventional resources has consisted of completing and stimulating the entire lateral length of a horizontal well shortly after drilling to total depth (TD). In the top five liquids-rich North American producing basins, a majority of unconventional well...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185377-MS
... the wells. The sand failure assessment section of the study concluded that: All wells displayed a moderate to high risk of sand failure for an open-hole (OH) completion at the start of field life using conservative strength parameters. This result is consistent with the brittle/friable...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185421-MS
... characteristics, completion constraints and high near wellbore frictions were some of the challenges observed during fracturing treatments. As the reservoir is having very low permeability, hybrid fracturing treatment with a pad comprising around 75 percent linear / slick gel followed by cross-linked slurry was...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185414-MS
... Horizontal open-hole completion: -Considering conducive reservoir properties and having potential to enhance productivity, horizontal wells thought to be a good option. Hence, few horizontal wells were drilled using latest technology and completed with sand control completion. Some horizontal...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185437-MS
... reservoir in MHN commenced in May 1976 through wells completed in multiple layers. Water injection started, around 8 years later in 1984, peripherally in multiple layers through 4 water injection WI platforms. Subsequently, it was extended to the central row of the field in 1988 and in up-dip area during...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185383-MS
..., and stuck pipe. Apart from causing non-productive time (NPT), these events also increase the risk associated with drilling and completion of a well. Since, the development phase has just begun and geomechanics study was not incorporated in the exploration phase, there is enough scope to optimize...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178049-MS
... a new horizontal well and incorporate the designs necessary for a future cased-hole Acid-fracturing treatment. Well SF-AB, scheduled to be drilled and completed by mid-2013 was deemed as fit to be a candidate for the treatment program. The well design, still in its inception stage was revised...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178114-MS
... The optimum fracturing treatment design required an injection rate of 25 bpm with a maximum bottom-hole pressure of 12,200 psi. A 4 ½ inch mono-bore completion was required in order to achieve this rate and handle the pressure. The mono-bore completion consisted of a 4-1/2" frac string stung into...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178115-MS
... unpredictable. In view of uncertainties pertaining to reservoir thickness, quality and geometry, sub surface and completion team had to take the challenge to achieve the planned production by using the suitable sand control technology. All 6 wells in this field earlier were planned as horizontal with 300m drain...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, March 28–30, 2012
Paper Number: SPE-154920-MS
... predetermined time and the total fluid production is accumulated. Next time step is then repeated and streamline is continued until the complete production history is generated. Flood-front positions are generated by repeating the above process but now keeping a track of the injected volume per stream-tube...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, March 28–30, 2012
Paper Number: SPE-155145-MS
..., cluster development, modularization and standardization of process facilities/wells for optimizing cost, revamping existing jack-ups as mobile processing, CAPEX reduction through hired FPSO and use of advanced techniques like multilaterals, dual completions, zones transfers etc. Due to these initiatives...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, January 20–22, 2010
Paper Number: SPE-127311-MS
... potential helped understand well performance. Indeed, evolution of declining IPR slope led to the identification of gradual wellbore blockage in one of the wells completed openhole. Downhole video recording confirmed mechanical issues in two openhole completions. Production logging showed preferential flow...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, January 20–22, 2010
Paper Number: SPE-128394-MS
... upstream oil & gas spe 128394 frac string fracture stimulation treatment well completion operation frac cum completion string production rate hydraulic fracturing gas condensate reservoir drillstem testing service rig gas development completion fatehgarh reservoir well design...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, January 20–22, 2010
Paper Number: SPE-128612-MS
... fracture network intersection proppant fracturing materials perforation completion orientation reservoir upstream oil & gas fracturing fluid horizontal well annual technical conference directional drilling drilling operation transverse fracture horizontal wellbore fracture conductivity...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, January 20–22, 2010
Paper Number: SPE-129060-MS
... Studies have revealed that high permeability layers dominate the production of well and they are quickly watered out. It has been observed in several wells completed with simple completion strategies decided on the basis of conventional open-hole logs ended up with high water cut. Hence, to...

Product(s) added to cart

Close Modal