1-5 of 5
Keywords: Mumbai High field
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185412-MS
... water injection initiation producer reservoir conversion WOR pressure sink Upstream Oil & Gas History oil production rate Mumbai High field oil production Oil Recovery production rate carbonate reservoir waterflood waterflood management reservoir pressure This paper...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185437-MS
.... Abstract In the 3rd Phase of redevelopment scheme of the northern part of the Mumbai High Field the focus has been on exclusive development of "U1" i.e. the topmost layer of L-III reservoir, mainly in the western flank area through drilling new wells and side-tracks. Among the multi-layered accumulation...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, March 28–30, 2012
Paper Number: SPE-153396-MS
... for case studies, success stories and lessons learned from the Mumbai High field in the last decade; evolution of the production logging tool from the most standard unit to multipoint digital entry fluid imaging, gas holdup optical sensor tools to identify and distinguish between the three fluid...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, March 28–30, 2012
Paper Number: SPE-154823-MS
... Mumbai High Fields such as:, drilling top hole 17-1/2" section to complete the well in required hole size, drilling 8-1/2" multilateral section including open hole sidetrack, drilling 6" with RSS & pro-active geo-steering technologies keeping the well in good reservoir with high penetration rate and...
Proceedings Papers

Paper presented at the SPE Indian Oil and Gas Technical Conference and Exhibition, March 4–6, 2008
Paper Number: SPE-113699-MS
... support vessel in the hostile monsoon weather. The accident caused major disruption of offshore production systems of Mumbai High field. Multi disciplinary teams (MDTs) were constituted for planning, executing, coordinating and monitoring the tasks with active support from offshore field personnel and...

Product(s) added to cart

Close Modal