1-9 of 9
Keywords: ESP
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 9–11, 2019
Paper Number: SPE-194687-MS
... Abstract This paper describes simulation solution for CT(Coil Tubing) based WBCO in flowing ESP/Jet Pump wells for scale/polymer debris deposition removal prior to any treatment in well, such as – Formation stimulation, ESP treatment, etc. It also describes prediction for requirement of Surface...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, April 4–6, 2017
Paper Number: SPE-185332-MS
... was added in the treatment solution. The weight of the cable was accurately measured before and after the test. The NSD ® - HTF solution was visually examined for discoloration and the pH was measured. No adverse effects on the cable and other components of the ESP were observed. Compatibility of the NSD ®...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178063-MS
... Eliminate ESP failures due to frequent motor under-loading caused by gas locking of the ESP. Prolong the Run-life of the ESP and reduce downtime and cost. Isolate and protect the Casing from corrosive production fluid and prevent gas production up the annulus. Safer well control...
Proceedings Papers

Paper presented at the SPE Oil & Gas India Conference and Exhibition, November 24–26, 2015
Paper Number: SPE-178096-MS
... of gas, possibility of using gas lift was eliminated. However, highly under saturated crude with favourable reservoir conditions made it an attractive proposition to install ESP as artificial lift in the field. Though the initial experience with ESP was inflicted with setbacks and suboptimal performance...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, January 20–22, 2010
Paper Number: SPE-126681-MS
.... The system is constrained both on the gas lift supply and surface production networks. The conversion of two of the major gas lift producers to electric submersible pump (ESP) has helped de-bottleneck the Falah system. The main objectives were to increase drawdown in these wells using ESP and to reduce...
Proceedings Papers

Paper presented at the SPE Oil and Gas India Conference and Exhibition, January 20–22, 2010
Paper Number: SPE-128381-MS
... and finally injecting the well. The model also incorporates 84 new ESP, which will be installed by the end of year 2009 to replace the existing gas lift system. The model predicts an additional oil gain of 2,500 bopd (14.7%) as a result of installing ESP. About 170,000 blpd of liquid will be produced after...

Product(s) added to cart

Close Modal