Abstract
With exploration in harsh environments and consequent high pressure and temperature conditions, the calculation of reservoir properties has become complex and thus the changes in pressure transient response need to be understood and appreciated by taking appropriate challenging measures.
The paper deals with the various challenges arising when dealing with the drilling and testing of HPHT gas wells with Hydrogen sulfide and Carbon dioxide, located in Krishna Godavari (KG) Basin and the difficulties faced while executing it. The paper focuses on the experience while drilling the reservoir with a different mud program and mechanical failure caused by HPHT conditions & highly corrosive environment. The paper also highlights the preference of SOBM over WBM while drilling the reservoir section. It also describes the learning process as the exploratory well campaign progresses from one well to other. It briefs about the challenges while performing MDT as per the program in these high temperature environment. The paper briefs about the decision involved in selection of proper grade tubing, elastomer, packer, flowhead equipments, DST tools & explosives in this HPHT environment along with Hydrogen sulfide & Carbon Dioxide. In any gas well testing, exhaustive amount of data over the requisite period of time are necessary; data redundancy necessitates redressing of equipments. The biggest challenges faced by industry are high temperature rather than high pressures, so making metallurgy an important basis of consideration. It also highlights about the method followed during correlation of prospective zones using different logs.
The paper discusses the unexpected results and observations obtained during execution of our program and the lessons learnt from it.