1-7 of 7
Keywords: winch
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 3–6, 2013
Paper Number: SPE-166562-MS
... slipping and bending. Consequently, winch systems designed for steel rope cause the rapid wear of fibre rope. On the other hand, existing systems for the handling of fibre rope are relatively slow, work discontinuously and/or require a complex design and intricate control systems. Developing a new type...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145190-MS
... chain was attached to the top of the fairlead and it was pulled up into a slot in the FPSO's hull using a winch setup in the upper levels of the FPSO turret. The chain was cut and terminated in the annulus between the Turret and the FPSO's hull. Therefore, this chain needed to be severed before...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30374-MS
... approximately 600 metres long using a construction site at Point of Ayr. The pipeslrings were pulled into position by the bottom pull technique using an 800 tonne capacity winch spread on a marine barge. On completion of the pulling operation the pipelines were buried in the seabed using a submarine trenching...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23088-MS
.... winch end fitting flowline pull-in operation resistance diameter operation inner plastic tube pipe platform flexible pipe upstream oil & gas coefficient sheath friction flexible riser plastic sheath arrangement spe 23088 requirement INTRODUCTION Satellite well developments...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23051-MS
... ABSTRACT A prototype subsea wireline winch was constructed and run in a test well in 1985, using a borrowed hydraulic power pack 1 , 2 . Since then a complete system has been designed and constructed, including a subsea wireline blowout preventor (BOP), subsea electro-hydraulic power...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 15–18, 1981
Paper Number: SPE-10411-MS
... mooring. Finally, an investigation was carried out to assess the performance of a position-controlled winch system used in conjunction with the stern moorings. The tests showed that significantly lower line-tensions were obtained in comparison with the conventional stern moorings and snatching...
Proceedings Papers

Paper presented at the Offshore Europe, September 14–15, 1977
Paper Number: SPE-6694-MS
... is mated with the wellhead cellar - LPS'S name for this enclosure - at the time of flowline pull-in, it was decided to make use of the downhaul winch and cable for the pull-in task. The problems which remained were those of establishing the pulling cables from the wellhead to the surface, scaling around...

Product(s) added to cart

Close Modal