Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-3 of 3
Keywords: topside facility
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19285-MS
... ABSTRACT This paper describes the TRILITE Super Satellite Platform (TRISS), a light 3-legged cost-effective fixed jacket substructure concept supporting a simple topside facility intended for unmanned operation. An overall objective has been to develop a realistic alternative to sub-sea...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 8–11, 1987
Paper Number: SPE-16566-MS
...) providing power for: – radio and telemetry system, – navigational aids, – data processing unit for downhole gauges Total installed capacity was ca. 500 kWh (total weight of batteries was ca. 1800 kg). Access and Lifting Facilities CONCLUSION Simple topside facilities are cost...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 6–9, 1983
Paper Number: SPE-11888-MS
... be doubled, and engineering feasibility will limit what can be achieved. specification noise topside facility upstream oil & gas contractor offshore installation design stage consideration design procedure vibration control offshore installation noise level guidance procedure fpso...