1-18 of 18
Keywords: slurry
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2023
Paper Number: SPE-215591-MS
... equipment flow assurance lund coil international conference subsea processing particle pipe cooler pipe subsea pipeline free society hydrate deposit slurry larsen mmegjerde inductive coil petroleum engineer subsea cooler unit Introduction Wax and hydrates are two of the main flow...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2023
Paper Number: SPE-215497-MS
... cement chemistry cement formulation reservoir characterization percolation threshold cement paste netherlands slurry wellbore integrity cement property shrinkage cement sheath young mpa clinker Introduction Zonal isolation in active and abandoned wells is paramount to ensure minimal...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 3–6, 2019
Paper Number: SPE-195725-MS
... and cementing pore pressure ECD overbalance liner reservoir designer mud Drilling resilient cement well control overburden flow rate cement job slurry Elgin Upstream Oil & Gas MWW operation infill drilling Infill Drilling Campaign Introduction Following the discovery of Franklin...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175425-MS
... 1h05m 1h15m A total of 210 liters of thermal activated resin slurry was prepared accordingly to the recipe in Table 5 , with a setting time around 1.5 hours at ambient temperature. After testing the surface lines, the pump, the drum and once the injectivity rate was established, the rest...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124607-MS
... Upstream Oil & Gas cement chemistry Conductor cement property casing and cementing drilling fluid conductor movement cement md rkb Swf exploration well slurry society of petroleum engineers drilling fluid property casing design mechanism cement job well cement drilling fluid selection...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 4–7, 2007
Paper Number: SPE-106964-MS
... cement chemistry generation 0 plug intelligent cement cement property cement formulation ECSC Upstream Oil & Gas mix water reduction casing and cementing cement compressive strength control additive DEGF bc 04 Slurry Design spe 106964 retarder drilling fluids and materials...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 2–5, 2003
Paper Number: SPE-83955-MS
... tubing rotary drilling (TTRD) technology presents its own challenges to cementing design. The management of the equivalent circulating density (ECD), typically at its highest levels during the final stages of the cement slurry displacement, is a critical parameter of the fluids design process. The use...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30350-MS
... operation mudweight drillpipe horizontal section drilling aspect payzone slurry permeability horizontal well sidetrack spacer upstream oil & gas assembly sandstone directional drilling assembly reservoir geomechanics drilling assembly geology deep horizontal well geological...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30432-MS
... Abstract Thirty thousand barrels of slurried drill cuttings waste, generated during the Wytch Farm Extended Reach Drilling programme, have been successfully injected into a producing sandstone formation as an environmentally acceptable means of disposal. Injection was through an existing water...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30433-MS
... with adjustments for unplanned events. Economics of CRI and natural oil base verses synthetic (psuedo) oil mud. Conclusions and recommendations for future work. drilling fluid formulation drilling fluid chemistry drilling fluids and materials british gas slurry drilling fluid property society...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26681-MS
..., on a weight by dry weight basis, prior to discharge overboard or they have to be disposed of other than to the seabed. A number of options for disposal are being developed ( ref. 1 ) but one that appears particularly attractive is the grinding and slurrying of oily cuttings. The resultant fluid is used...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26680-MS
... between 6200'-7000'TVD, bounded by 200' of salt above and 1500' of shale below. Topside equipment consisted of a prototype Cuttings Processing Package (CPP), a screw conveyor, a slurry storage tank and a small triplex pump. north sea specification tank production monitoring slurry reservoir...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26725-MS
... ABSTRACT New cement slurry formulations containing colloidal silica have been used in North Sea primary cementing operations to help control annular gas migration, enhance slurry "turbulent flow" characteristics without solids settling, and aid cement bonding to formation and casing. Colloidal...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23075-MS
.... Waterdroplets containing a controlled number of species are emulsified into mineral oil. This W/O emulsion is then emulsified into the cement slurry in small amounts (3-15 vol %). The effect of the emulsion on the cement slurry has been recorded through standard API tests. In addition the bond between cement...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23074-MS
... Abstract High-temperature cementing (above 300°F(149°C) remains a complex operation from job design and execution viewpoints. Temperature prediction is of crucial importance and is still a challenge. To design a slurry with excellent properties (thickening time, rheology, stability and fluid...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23144-MS
... the well histories, the production profiles and the decision process in selecting coiled tubing cement squeezing over more traditional methods of isolation. It discusses the preparatory work required for proper slurry formulation, the equipment lay-out and step by step procedures used in performing the job...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 15–18, 1981
Paper Number: SPE-10396-MS
... on field results. fracture reservoir matrix permeability water production placement producer upstream oil & gas injection well oil production enhanced recovery flood water spe 10396 perforation efficiency slurry viscosity polymer water control united states government flow...

Product(s) added to cart

Close Modal