1-20 of 24
Keywords: modification
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 7–10, 2021
Paper Number: SPE-205436-MS
... development renewable energy climate change upstream oil & gas power management performance monitoring co 2 electricity energy efficient design operation novel technology pathway social responsibility investment modification consideration decarbonisation emission optimisation power...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2017
Paper Number: SPE-186117-MS
.... The primary goal was to refit the rig to accept and operate in line with applicable PSA requirements, a 20.0 psi rated double BOP ram to be used in conjunction with the rig's 15,000 psi BOP. The scope included the installation of two different MPD annular pressure control systems. The modifications were...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175430-MS
.... A simplified, safer process in a controlled environment has been created whilst balancing the requirements of a capital budget, against reduced OPEX and process risk. It is estimated that the modifications have added at least 15 years of safe, viable, profitable production to the Thistle's lifespan, a great...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175440-MS
... the risks associated with unknown internal condition of the riser. Upstream Oil & Gas Bend Restrictor riser modification stud FPSO Offshore tooling Teal Riser internal diameter diver-less removal anode trevor jones spigot information diameter operation society of petroleum...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 3–6, 2013
Paper Number: SPE-166548-MS
.... well control equipment BOP stack conventional subsea wellhead Upstream Oil & Gas spe 166548 Wellhead surface BOP modification consideration rig Drilling Equipment subsea equipment control system jack-up drilling society of petroleum engineers subsea wellhead changeover conventional...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-123707-MS
..., avoiding the use of the fire-fighting system. Significant results obtained in the last 20 years of analysis are discussed for Semi-submersible and Fixed Platforms, FSO and FPSO, with plants capable of processing from 15,000 to 200,000 barrels per day. temperature distribution modification flame...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124600-MS
... to the development work along with modifications to the production unit, offtake options and collective benefits. It thereby provides a context in which we can examine the potential for similar development opportunities in the future. Management, contract strategies and organisational factors played a critical role...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-96751-MS
.... intervention cost repair strategy different intervention strategy upstream oil & gas strategic planning and management modification production availability availability project management spe 96751 contribution asset and portfolio management eriksen optimization simulation model reliability...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-96403-MS
... modifications on the three existing platforms. This results in a high offshore activity level for several years on a field in production. A new gas export pipeline to the UK FLAGS system (Far north Liquid And Gas System) is necessary to provide sufficient offtake of the produced gas. Implementation of a new...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-96345-MS
... that Heather platform process capacity would not be much affected during topsides modifications. However, this has not proved to be the case, and the water injection and gaslift required to sustain production have not been available during much of the modifications' period. Other major factors have been...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 2–5, 2003
Paper Number: SPE-83976-MS
... development society of petroleum engineers oil company new technology sand production subsea separation station rasmussen abb offshore system separator upstream oil & gas reservoir separation station petroleum engineer modification subsea system presentation tank operation subsea...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 2–5, 2003
Paper Number: SPE-83975-MS
... and mitigating measures (slug control systems, use of Kinetic Hydrate Inhibition facilities), their installation and other modifications required to accept Otter on the space constrained host Shell platforms. It also discusses the technical, commercial, contractual and risk management methodology employed...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 4–7, 2001
Paper Number: SPE-71861-MS
... modification completion equipment completion installation and operations dzicv spe 71861 platform hydraulic line electro hydraulic module communication case study interface operator gulf position sensor intelligent completion system Introduction This case history is the first in the Gulf...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30346-MS
... manner once work on the northern well is finished. Logistics Interruptions to production had to be minimised; therefore, the activities requiring hot work had to be incorporated into a planned platform shutdown. The modifications to provide clearance for the 46" caisson took approximately 1600...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30383-MS
... modification business plan contract installation sedco forex team member completion project manager upstream oil & gas Introduction A centrally located North Sea oil field with estimated reserves of 60 mmbls of oil, and 160 bcf of gas equivalents; with complex geology, and reservoir...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26755-MS
... and conventional stand alone drilling mode for a UKCS development project. The planning, design, modifications, and performance tests were completed within the contract schedule and budget cost and the unit was delivered ready for platform hook-up and drilling operations in December 1992. This paper discusses...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26789-MS
... Abstract Current modifications will dramatically reduce the complexity of the East Leman Unit production platforms. They include by-passing all the major processing facilities on the platforms and installing new utility packages to support an unmanned operation. This has enabled the frequency...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23085-MS
... with highlights of previous deployments in the harsh Beaufort Sea environment. The operational flexibility and capability of this structure for use within a range of Arctic offshore development alternatives is discussed, including modifications to the structure for increased production capacity and various...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23126-MS
... with loss in production. Acoustic excitation of compressor recycle piping caused by vortex shedding past piping discontinuities. The importance of meaningful data collection and correlation with existing theory, and the modifications necessary for solution, will be discussed in order to enable design...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23151-MS
... to export oil from third parties: Buchan, Brae, and Montrose. This has necessitated several modifications on FC, the collector platform. A fifth platform, FE, a remotely-operated, normally unmanned wellhead platform, was installed in 1987. Oil produced on FE is processed on FA. As a consequence the FA...

Product(s) added to cart

Close Modal