Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175501-MS
... material should be “drained, cleaned, purged and tested” for flammable vapours before the welding process is initiated. The transfer piping should also be drained, purged and blanked. Welding is proven to be the most recognised repair and fabrication method for metallic equipment and structures...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 7–10, 1999
Paper Number: SPE-56915-MS
... offshore phase installation spe 56915 upstream oil & gas amec fabrication platform spool offshore interface management team personnel operation philosophy completion subsea system Introduction The paper sets out to chart the step change continuous improvements achieved in UKCS...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30368-MS
... and provides the fastest method for an organisation to achieve improved performance. Given the complexity of the project we could not target all 17 major contracts so we selected four areas for attention: fabrication of the Douglas deck; fabrication of jackets, piles and satellite decks; strip out...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30376-MS
... productivity manhour subcontractor fabrication arrangement united states government target contract 5 contract 1 target manhour europe government contract 2 overrun sharing Introduction The words "partnering " and "alliances" have become as common in business parlance as "increasing...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26772-MS
... Abstract This paper describes the design, fabrication and installation of the gas and oil production facilities for the "Nederlandse Aardolie Maatschappij B.V." (NAM) F3-FB complex on the Dutch continental shelf of the North Sea. NAM carried out the basic conceptual design for the complex...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26771-MS
... for the future. lift point spe 26771 crane reach cost savings separation consideration fabrication crane limit spe 26771 sscv module upstream oil & gas lifting society of petroleum engineers today offshore industry lift capacity europe government barge lifting atthe limit topsides...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19228-MS
... and water can either be exported via a tanker or alternatively pumped as a single phase pump to a production platform. This paper presents the concept, summarises the economics and details the experience gained todate from the design, fabrication, installation and commissioning of pilot unit installed...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19285-MS
.... fabrication installation triss reduction barge topside facility caisson construction unmanned topside floater upstream oil & gas topside field center water depth sequence platform transportation subsea system norway government author title triss conductor trilite jacket europe...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14032-MS
... water depth northern North Sea field. basu loading wave loading fabrication buoyancy chamber design consideration guyed tower platform shear pile subsea system arrangement stability upstream oil & gas ballast chamber buoyant platform water depth netherlands government united...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14031-MS
... ABSTRACT The Hydeep platform has in our analyses demonstrated good fatigue behaviour, especially in its lower part. Its fabrication schedule is also comparably shorter due to being split into two units. The platform can also be extended for use in greater water depths than the 305 m...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14025-MS
... the fabrication of the articulations and supervision by EMH. Each step of the re-design is clearly defined and a detailed description of the articulations is illustrated by pictures of the most important components during fabrication. The experience gained and the improvement to the system as a result...