Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-11 of 11
Keywords: fabrication
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175501-MS
... Welding is proven to be the most recognised repair and fabrication method for metallic equipment and structures. However, in scenarios of flammable and explosive environments, the welding process is restricted, since sparks and hot metal can become airborne and present a danger. Sources...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 7–10, 1999
Paper Number: SPE-56915-MS
... Fabrication yard incompletion (carryover). Offshore scope growth. The base scope activity levels. Design changes. The base scope manhours were primarily driven by the following: Hook-up spools fabrication, field welding with the accompanying, NDT and hydrotest. E&I...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30376-MS
... as companies gain experience with the concepts. contract 3 main contractor partnership risk reward structure manhour subcontractor fabrication arrangement risk reward element strategic planning and management upstream oil & gas middle east contract 4 productivity alliance contract...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30368-MS
... and provides the fastest method for an organisation to achieve improved performance. Given the complexity of the project we could not target all 17 major contracts so we selected four areas for attention: fabrication of the Douglas deck; fabrication of jackets, piles and satellite decks; strip out...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26771-MS
... For large lifted decks there is a need for reeducation, to ensure that time requirements for the structural fabrication, outfitting and commissioning activities are fully understood, and sufficiently long construction schedules are adopted. Only in this way will the full cost benefits of large...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26772-MS
... Abstract This paper describes the design, fabrication and installation of the gas and oil production facilities for the "Nederlandse Aardolie Maatschappij B.V." (NAM) F3-FB complex on the Dutch continental shelf of the North Sea. NAM carried out the basic conceptual design for the complex...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19285-MS
.... fabrication sequence platform installation triss reduction floater upstream oil & gas topside field center water depth conductor trilite jacket approx wellhead separation and treating barge topside facility caisson construction unmanned topside transportation subsea system 1...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19228-MS
... presents the concept, summarises the economics and details the experience gained todate from the design, fabrication, installation and commissioning of pilot unit installed on Hamilton's Argyll field in the North Sea. subsea system platform insulation installation economic production method...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14031-MS
... ABSTRACT The Hydeep platform has in our analyses demonstrated good fatigue behaviour, especially in its lower part. Its fabrication schedule is also comparably shorter due to being split into two units. The platform can also be extended for use in greater water depths than the 305 m...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14032-MS
... water depth northern North Sea field. basu loading wave loading design consideration subsea system arrangement stability upstream oil & gas ballast chamber deepwater pile-founded buoyant platform buoyant platform fabrication guyed tower buoyancy chamber platform water depth...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14025-MS
... the fabrication of the articulations and supervision by EMH. Each step of the re-design is clearly defined and a detailed description of the articulations is illustrated by pictures of the most important components during fabrication. The experience gained and the improvement to the system as a result...