1-3 of 3
Keywords: dimension
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-123800-MS
... liner diameter in the reservoir section, one may be able to install advanced completion equipment with bigger dimensions. This allows the benefits of the downhole zonal control to be realised without hindering the well potential. Data from two wells one the Visund field, has been used to demonstrate...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23087-MS
... base-plate loads - minimise length of risers - allow for all installation requirements. System Design and Analvsis After selection of the overall configuration a large engineering effort was involved in computer analysis to optimise the details of the layout including dimensions and lengths for...
Proceedings Papers

Paper presented at the Offshore Europe, September 14–15, 1977
Paper Number: SPE-6691-MS
... following are the major steps in the connection operation. 1. Initial chamber entry. 2. Preparation of the riser pipe. 3. Preparation of the bullnose. 4. Measurement and calculation to determine pup joint dimensions. 5. Preparation of pup. 6. Fitting of pup. 7. Welding of pup. 8. Non-destructive test of...

Product(s) added to cart

Close Modal