Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 33
Keywords: construction
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Reducing Weight, Footprint, and Capital Cost of Sulphate Removal Units Using Modified Membranes
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2023
Paper Number: SPE-215521-MS
... removal unit sru footprint upstream oil & gas membrane reduction brine spacer thickness spiral geologist europe government society fouling thickness flux construction modified membrane recovery capital cost petroleum engineer Introduction Most RO/NF membrane elements...
Proceedings Papers
The Clair Ridge Project - A Safety Leadership Journey to Create a Strong Culture of Care
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Conference and Exhibition, September 3–6, 2019
Paper Number: SPE-195782-MS
... Throughout execution there were up to 750 people offshore at any time, but with the continually changing work fronts throughout construction and the transition to commissioning and readiness for first oil, over 7000 individuals were deployed offshore throughout the hook up and commissioning...
Proceedings Papers
The Solan Field Subsea Oil Storage Tank after One Year's Operation West of Shetland, UK - is it a Concept that has Delivered?
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2017
Paper Number: SPE-186161-MS
... inspection. The tank's detailed design and construction phase involved some significant changes as the structural and fatigue life issues were fully analysed and implemented. The installation required significant pre-planning with the use of a very large lifting sling arrangement and a smart air venting...
Proceedings Papers
The challenge of developing talent to meet the offshore and shipbuilding demands in Brazil
Available to PurchaseBreno Barreto Medeiros, Marcus Coester, Clovis Leopoldo Reichert, Maria Virginia Pezzi, Rovanir Baungartner
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175512-MS
... to the needs and expectations of the shipyards: 94 in 2012; 125 in 2013 and 143 in 2014, with a total of 362 people trained at supervision/management level. The amount of people trained along three years generated positive impacts on the construction processes productivity, but impacts have not been precisely...
Proceedings Papers
Minimising HSE Impacts During Design and Construction of a Major Gas Pipeline Through the Baltic Sea
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145390-MS
... The environmental impact of the project has been investigated thoroughly prior to construction. The gas pipelines will go through areas of the seabed in the economic zones of Russia, Finland, Sweden, Denmark and Germany. Moreover, the countries of Estonia, Latvia, Lithuania and Poland also have...
Proceedings Papers
ZipLog—The Third Method for Well Intervention: Practical Field Experience and Unique Opportunities for the Future
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-121518-MS
... on pushing a spoolable specially constructed carbon "rod" into live and pressurized wells, has been successfully developed and deployed into horizontal wellbores in the Middle East as well as North America. This paper describes the background for the solution, the development and qualification program...
Proceedings Papers
Process for Tracking the Evolving Perception of Risk During CO 2 Storage Projects
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124703-MS
... of the perception of risks to be tracked. The process is summarised below: Step 1. List Construction . Construct or obtain a comprehensive list of all known possible features, process and events (FEPs) that might conceivably pose a project risk. Construct or obtain preliminary likelihood and severity scales...
Proceedings Papers
CO 2 Storage Geomechanics for Performance and Risk Management
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 4–7, 2007
Paper Number: SPE-108528-MS
...One-dimensional Mechanical Earth Modeling The process starts with the building of a series of static well Mechanical Earth Models, or 1D-MEMs, along well trajectories. 1D-MEM construction consists of integrating data from various sources into a model that consistently describes the rock...
Proceedings Papers
Realizing Single-Diameter Wellbore Technology
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-96655-MS
... Abstract The provenance of the single-diameter well consists of over 350 commercial installations of solid expandable tubular systems and a concise, yet encompassing development plan. The maturation of expandable technology has led to successful design, construction and testing of individual...
Proceedings Papers
Progress Towards Zero Based Hook-up
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 7–10, 1999
Paper Number: SPE-56915-MS
... is not complete yet. We believe that there are still significant activity level reductions to be delivered some of which we have already targeted and no doubt we or others will deliver yet more. manhour step change britannia hookup construction knowledge management onshore commissioning and startup...
Proceedings Papers
Optimised Slot Utilization with a Geosteered Multilateral Well
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 7–10, 1999
Paper Number: SPE-56931-MS
... sector of the North Sea. This dual lateral well, TA-06, represents a major technical milestone in the process of constructing wells with both complex drainage architecture and highly specific reservoir targets from a slot valued platform. Moreover TA-06 also represents a major economic success...
Proceedings Papers
Well Construction, Competency, and the Tay Bridge Disaster
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 7–10, 1999
Paper Number: SPE-56924-MS
... of Rothery's criticism of Bouch rings a little hollow. He had indeed failed to account sufficiently for wind pressure in his design. However, he had asked advice of other prominent engineers during the design and construction phases and was advised of current best practice. This was either...
Proceedings Papers
Turret Design and Construction: Keeping It Off the Critical Path
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 9–12, 1997
Paper Number: SPE-38545-MS
... Captain FPSO, these engineering functions as well as the construction of the turret were performed by the shipyard. This allowed the engineering and construction activities of the turret to be integrated with the overall engineering and construction schedule of the rest of the vessel. This ensured...
Proceedings Papers
Integrating Parallel Engineering with Phased Field Development in order to Balance Cash Flow, Net Present Value, and Risk
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 9–12, 1997
Paper Number: SPE-38490-MS
... cash flow value petroleum engineer phased field development balance cash flow society development field development contractor development plan programme exploration spe 38490 integrating parallel engineering construction Introduction Many of the oil and gas reserves which have...
Proceedings Papers
The Harding Field: A Low Development Cost per Barrel Concept Becomes a Reality
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30384-MS
... barrel concept management team conflict objective design contractor upstream oil & gas low development cost construction strategic planning and management united states government united kingdom government responsibility drilling operation harding installation europe government north...
Proceedings Papers
Changes to Regulation of Drilling and Workovers in UK Sector by Removal of Prescription
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30360-MS
... standards for wells and well operations. abandonment requirement regulation society of petroleum engineers well operation certificate construction upstream oil & gas installation workover operational safety regime reasonably practicable hazard well design safety case drilling...
Proceedings Papers
The Feasibility and Construction of the Landfall at the Liverpool Bay Development, Point of Ayr, North Wales
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30374-MS
... Abstract This paper describes the feasibility and construction of the landfall of a 20" gas pipeline and two 3" piggy-backed condensate pipelines at Point of Ayr, North Wales from BHP Petroleum's Liverpool Bay Development. The 4,340 metre long pipeline was constructed from pipeslrings, each...
Proceedings Papers
Leman Field Facilities Rationalisation
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30396-MS
... petroleum engineer sub-sea system compression construction modification Introduction The Shell Expro operated part of the Leman gas field in the UK Soudiem North Sea (Block 49/26) has been in production for over a quarter of a cen-tury. Shell Expro is the operator on behalf of Shell UK Ltd...
Proceedings Papers
Partnering on the Forties Field
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26769-MS
... reserves were then estimated at 1.8 billion barrels. Four platforms were designed, constructed and installed and first oil was produced in September in 1975. Peak production of 500,000 barrels per day was reached in May 1978. A fifth platform was installed in 1986 and the 2 billionth barrel of oil...
Proceedings Papers
An Alternative for Shallow Water Oilfield Development in Arctic Waters
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23085-MS
... operation canadian beaufort sea landfast ice exploration ice cover molikpaq modification drillstem testing ice condition storage upstream oil & gas caisson construction berm spe 23085 crude storage tanker INTRODUCTION The search for new sources of oil and gas has carried...
1