1-20 of 36
Keywords: connector
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 7–10, 2021
Paper Number: SPE-205412-MS
...Introduction Abstract Understanding the structural limits of subsea connectors used in offshore environments is critical to ensure safe operations. The latest industry standards establish the requirement for physical testing to validate analysis methodologies for connector designs...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175476-MS
... Upstream Oil & Gas cylinder application installation force society of petroleum engineers Makeup Torque cam device special tool installation Drilling Equipment connector teeth key quantity performance difference installation time strength torque CAM anti-rotation device...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175441-MS
... in more modern designs. Harsh subsea environments, such as in the Northern North Sea can add further severity to fatigue damage accumulation. Introduction Upstream Oil & Gas information housing weld wellhead system connector riser system assessment application refinement fatigue life...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175444-MS
.... Bolting-up or during the assembly stage Abstract In this paper, a design methodology is presented for analysing a non-gasketed bolted flange connector, for subsea applications where the flange is subject to various combinations of mechanical loading. The proposed methodology is aligned with the API...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 3–6, 2013
Paper Number: SPE-166592-MS
.... However, traditional FEA methods use shell or solid dimensional elements for this problem and are computationally expensive. In this paper, an explicit FEA based on beam and connector elements implemented in the Abaqus software is employed to study the buckling of drill strings in different wellbores...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 3–6, 2013
Paper Number: SPE-166554-MS
... During initial loading of the connector, threads in the lower loads remain in the elastic regime and the bathtub curve is fairly steep, as illustrated in Figure 5 As higher and higher loads are applied to the connector in tension and/or bending, the local stresses in the first and last threads...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145512-MS
... the tree-hub to a condition which would allow the BOP to be run back onto the tree. In two separate DSV interventions, divers removed the damaged VX gasket with hydraulic arms, and cut the damaged area using a diamond rope cutter and Grayserv cutter. It was then possible to trial fit an H-4 connector over...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-123757-MS
... line hanger safety valve landing nipple wet mate completion equipment WDCL safety valve assembly control line Upstream Oil & Gas NAM functionality valve Completion Installation and Operations connector damaged control line safety valve restore full safety valve functionality society...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124290-MS
... society of petroleum engineers Upstream Oil & Gas prcm module spe 124290 subsea production system petroleum engineer subsea production equipment x-tree electric subsea system escm seawater return installation connector condition monitoring All Electric Technology, Introduction...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-93639-MS
... upstream oil & gas completion installation and operations swivel torque orientation accuracy orientation sandstone interval production life debris andrew field gun system perforation tunnel connector accuracy isolation valve alignment-error result Introduction The Andrew field...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 4–7, 2001
Paper Number: SPE-71826-MS
... describes the method and identifies its operational and cost advantages over other development methods. field life upstream oil & gas module valve separation and treating connector maintenance enhanced recovery host facility spe 71826 smart asset reduction system-modular management...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 4–7, 2001
Paper Number: SPE-71829-MS
...-of-the-art in fiber sensing for such applications. jumper connector production monitoring fiber completion monitoring systems/intelligent wells spe 71829 abb offshore system ltd wet mateable connector fusion splice 1 0 kla eriksson abb corporate research installation reservoir surveillance...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 7–10, 1999
Paper Number: SPE-56914-MS
... and will outline advantages and drawbacks, both technical and financial, of the two solutions. piping design horizontal spool flowline connector spool subsea system connection technique piping simulation deepwater tie-in installation collet connector scenario flange upstream oil & gas rigid...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 9–12, 1997
Paper Number: SPE-38534-MS
... team addressed the technical challenges of the project, and gives feedback on progress achieved since start of production in July 1997. artificial lift system drillstem/well testing Drillstem Testing longest subsea esp tie-back separator connector Upstream Oil & Gas guillemot crude...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30406-MS
.... This paper explains the process of evaluation, selection, development and testing of both systems. The relative applicability of each system is discussed. hole swab valve dhsv failure mode deployment system completion equipment coil bha perforation option well kill snaplock connector valve...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23086-MS
..., the allowable Von Mises stress is based on minimum wall thickness and acceptance criteria of Ref. 1 , and takes into account fabrication and installation tolerances, and corrosion allowance. The riser couplings and connectors are designed to meet industry practice, including the acceptance criteria of API...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23050-MS
... for atubing orcable suspended pump application. electrical connection esp workover procedure subsea system cable upstream oil & gas penetrator spe 23050 artificial lift system connector society of petroleum engineers installation requirement recovery crown plug distribution manifold...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23145-MS
... completion wellhead connector wellhead housing tieback annulus valve completion equipment completion installation and operations INTRODUCTION The Welland Field, which consists of three separate accumulations, lies in blocks 49/29b and 53/4a of the UK sector of the Southern North Sea (See...

Product(s) added to cart

Close Modal