1-15 of 15
Keywords: conductor
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124233-MS
... selected due to significant commercial advantage over alternative developments. The Magnus jacket was modified to permit running of four additional large conductors into which two smaller casings could respectively be installed. A tapered jacket profile necessitated preinstalled conductor guide frames to...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124607-MS
... to drill conductor and surface casing intervals riserless. API (2002) recognized three different scenarios that are related to development of transmission of geopressure through flow channels in and around the cement surrounding the casing: Bad primary cement job, flow occurring during cement...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1995
Paper Number: SPE-30346-MS
... the development. The challenge was that Alba had a minimum facilities platform, designed with only 24 slots as shown in Figure 2. Several means of obtaining more slots were considered. Conductor slot sharing was identified as the preferred method since it required no change to the Alba well...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26696-MS
... drilling and partially completing nine wells, setting 30" conductor and 22" surface liners in the remaining 47 TLP-template well slots and drilling and completing 6 water injection wells in two remote subsea templates. This paper will review the extensive planning as part of the overall Heidrun project...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23058-MS
... of casing strings. Design: Simple, with easy-to-understand operational procedures. Conductor installation: Driven, drilled, or drill and drive. Operation on Texas Deck: Steps reduced and simplified to increase safety, with a fast make up of the BOP to wellhead connections. Use existing seal...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23048-MS
... presented of the structural analysis of subsea completions subjected to bending loads. The paper looks at the stresses and internal loads induced near the mudline in the wellhead, conductor and casing and, in particular, the effect of cement shortfalls and different soil conditions are explored. The insight...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 3–6, 1991
Paper Number: SPE-23057-MS
... simultaneously, the standard solution was to support casing at the surface location using slips and seals. P. 261 wellhead system operator installation application upstream oil & gas safety adjustable wellhead conductor operation configuration society of petroleum engineers riser annular...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19285-MS
... weight reductions. Furthermore, additional ideas conforming with this objective has been launched and studied, such as utilizing prestressed conductors and routing caissons inside the legs. Another novel feature is the installation method for cases where the installation weight exceeds the current SSCV...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19251-MS
... conductor horizontal well SPE SPE number/page 19251/1 SPECIFICS OF HORIZONTAL DRILLING IN THE ZUIDWAL GAS FIELD Title B. LEGRIS, ELF PETRGLAND B.V. and G. NAZZAL, EASTMAN CHRISTENSEN LTD. Authors Copyright 1989, Society of Petroleum Engineers This paper was prepared for presentation at Offshore Europe...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14029-MS
... this requirement. Additionally, the system included the facility to change out individual risers, while others remained in use. The basic system, which utilises pile driven drilling conductors and flexible risers, is reviewed and the key system components discussed in detail. The cost benefits, which...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14031-MS
... fabrication platform north sea conclusion water depth lower part subsea system structure hydeep upper part assembly conductor norsk hydro upstream oil & gas float-out weight fatigue life disadvantage (- I . . ~ J 1 i ~ ~ - ;i .i' .. i,.J ,; _, . -: SPE14031/l DEEP WATER JACKET FOR NORTH...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 6–9, 1983
Paper Number: SPE-11916-MS
... 100,000 bopd. platform's design production rate of 100,000 bopd. FEATURES OF THE NORTH WEST HUTTON JACKET The jacket is a piled steel jacket, shown schematically in Fig. 1. There are six conductor-guide levels in the jacket and one further lateral restraint at the platform cellar deck. The jacket is...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 6–9, 1983
Paper Number: SPE-11907-MS
... various combinations of power conductors, co-axia and twisted pairs to carry the sensor data. These umbilicals, however, have inherent disadvantages which become apparent as sensor data increase in quantity and complexity. This disadvantage is the incompatibility of required high quality-data being...
Proceedings Papers

Paper presented at the Offshore Europe Conference, September 3–7, 1979
Paper Number: SPE-8157-MS
... loading on the platform construction and development drilling and helping speed initial production start-up. Experience gained from the exploration programme helped Occidental decide that it would be possible to develop Piper, utilizing a redesigned 20 in. string as conductor and doing away with the 30 in...
Proceedings Papers

Paper presented at the Offshore Europe Conference, September 3–7, 1979
Paper Number: SPE-8171-MS
... protection forties structure Production Chemistry Conductor Corrosion Inhibition H2S management cathodic protection coating deterioration corrosion control coating deterioration anode spe 8171 consumption oilfield chemistry Corrosion Management Production Platform Subsea recent experience...

Product(s) added to cart

Close Modal