Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 3–6, 2013
Paper Number: SPE-166637-MS
...-7000. Mariner and Bressay have a footprint of 90m × 48m, more commonly know as the size of a football pitch. It also shows the size of the Valemon platform, which is in deeper water than other jackets at 133.5m. Case Study - Valemon Jacket Story Introduction Moving to a barge launched...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 4–7, 2001
Paper Number: SPE-71805-MS
... hydrate slurry cng offshore gas-to-solid technology barge Introduction The Hydrates Technology Programme was launched by BG in 1993 to investigate ways of establishing a low cost alternative means of transocean gas transportation. The technology entails converting the gas into a hydrate...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 7–10, 1993
Paper Number: SPE-26771-MS
... for the future. lift point spe 26771 crane reach cost savings separation consideration fabrication crane limit spe 26771 sscv module upstream oil & gas lifting society of petroleum engineers today offshore industry lift capacity europe government barge lifting atthe limit topsides...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 5–8, 1989
Paper Number: SPE-19285-MS
... and studied, such as utilizing prestressed conductors and routing caissons inside the legs. Another novel feature is the installation method for cases where the installation weight exceeds the current SSCV lifting capacity, i.e. with use of a special purpose concrete barge-CONRAFT. The approach involves e.g...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14014-MS
... subsea system north sea netherlands government norway government denmark government united kingdom government offshore pipeline europe government midstream oil & gas rockall barge pipeline procedure spe14014 1 deepwater pipeline development norwegian trench INTRODUCTION It now...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 10–13, 1985
Paper Number: SPE-14006-MS
... the countdown to loadout and the work that was necessary to produce an essentially operational facility, prior to the mating of the deck and the hull. requirement sailaway procedure barge hution tlp marine surveyor minimise offshore hook upstream oil & gas loadout contractor inspection...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 6–9, 1983
Paper Number: SPE-11911-MS
... system heave motion operation numerical simulation choice and appucation passive cylinder support subsea operation load platform application barge choice and application assembly tension-leg platform DEFINITION OF AN MCS We will define the MCS in the following way: System allowing...
Proceedings Papers

Paper presented at the SPE Offshore Europe, September 15–18, 1981
Paper Number: SPE-10397-MS
.... A decision was reached in August 1979 to proceed with the installation of this pipeline during the 1980 construction season. Figure 2 . shows the actual cost and schedule for this pipeline. pipeline procedure installation upstream oil & gas welding approx teepiece conventional lay barge...
Proceedings Papers

Paper presented at the Offshore Europe Conference, September 3–7, 1979
Paper Number: SPE-8174-MS
... below. Midstream Oil & Gas North Sea trench platform pipeline sledge barge water depth stability requirement penetration offshore pipeline inspection coating protection spe 8174 protective measure failure rate Anchor concrete coating diameter pipeline ·0 Copyrigh~ SPE...
Proceedings Papers

Paper presented at the Offshore Europe Conference, September 3–7, 1979
Paper Number: SPE-8172-MS
... fatigue life could be of the order of a further 5 years. No strengthening of the platform was undertaken, however, as it was economically difficult to justify. Upstream Oil & Gas Griffith node platform corrosion seabed level inspection operation cutting barge Engineer imperial...