1-20 of 65
Keywords: assembly
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2023
Paper Number: SPE-215578-MS
... the annulus of plugged and abandoned subsea wells prior to wellhead severance but could be applied for other annular access purposes. completion installation and operations australia government europe government subsea system valve wellhead operation knowledge management assembly isolation...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2023
Paper Number: SPE-215527-MS
... drilling equipment protector cccp united kingdom government cable protector picp personnel lever cable protector installation assembly completion equipment europe government coupling crate torque wrench rih operation The stamped style CCCP shown, Fig 2 , comprises a main body, often...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference & Exhibition, September 5–8, 2017
Paper Number: SPE-186150-MS
... and umbilicals completion equipment Subsurface Safety Valve assembly electronics installation downhole electronics operation electric actuator equipment cost safety valve redundancy control system elimination module actuator valve Escssv electric system Introduction The K5F3 well...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175438-MS
... operate reliably in that environment. Use Conditions Abstract Remotely Operated Vehicles (ROVs) are complex systems that incorporate electronics, electromechanical assemblies, computing equipment and their associated software systems, structural assemblies, hydraulics, and a variety of commercial...
Proceedings Papers

Paper presented at the SPE Offshore Europe Conference and Exhibition, September 8–11, 2015
Paper Number: SPE-175501-MS
... Pipeline Corrosion well integrity separator assembly materials and corrosion Upstream Oil & Gas fabrication bonding material loading bonding agent society of petroleum engineers application substrate finite element analysis Subsurface Corrosion strength reinforcement plate hot work...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145167-MS
... projects in both the North Sea and worldwide. This paper details the industrialization process undertaken for ETH-PiP as part of the overall Islay Project delivery. Specific attention is drawn to the concept assessment, detailed design, project trials, assembly and offshore installation sequence...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145397-MS
... upstream oil & gas hydraulic fracturing waterflooding test assembly well dfe-05 plug cs gel treatment cs gel plug packer fracture sand production assembly spe 145397 cs gel agent enhanced recovery directional drilling drillstem/well testing maersk oil gel reservoir injection water...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145675-MS
... and cemented. After the liner perforation the MLT operations started with the installation of a multilateral anchor packer to allow for installation of a latch interface assembly (LIA) and milling system. The LIA was installed and locked into the multilateral packer on a separate run. The milling operation...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-145566-MS
... and in conjunction with all bottom hole assembly components. It is virtually transparent to all rig operations and, as a result, significantly decreases the implementation time and cost when compared to along string measurement solutions delivered by wired drill string technology. This is the first publication...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 6–8, 2011
Paper Number: SPE-146344-MS
.... In the test laboratory, the loading set-up includes the following considerations: The casing pipe is held fixed via slip system and the load is applied by raising the test assembly either by pushing up on the bowl for the conventional slips or by pulling up via a crossover to the new technology’s top...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-123757-MS
... line hanger safety valve landing nipple wet mate completion equipment WDCL safety valve assembly control line Upstream Oil & Gas NAM functionality valve Completion Installation and Operations connector damaged control line safety valve restore full safety valve functionality society...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-123305-MS
... and materials casing and cementing HPHT Drilling Equipment drilling fluid management & disposal complex reservoir Upstream Oil & Gas specific energy high pressure high temperature diameter completion strength application assembly casing design drilling operation resin spallation...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-123935-MS
... 123935 packer liner hollow whipstock HCSS hanger lateral completion assembly junction technology reduce well cost society of petroleum engineers ile formation permeable formation norwegian sea subsea well installation tilje formation Introduction The Åsgard license is a subsea...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124389-MS
... completion. This paper will discuss the well parameters and other critical information that enables frac-pack completions to be designed to meet today's more critical reservoir, safety, and cost-efficiency needs. Upstream Oil & Gas information Bottomhole Assembly oilfield environment hydraulic...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124391-MS
... & Gas Maersk Oil expandable liner hanger system liner hanger drill-in capability provide DwL operation assembly reservoir drilling operation expandable liner hanger torque drill-in capability provide reliable solution drillstring design drilling fluids and materials drill pipe selection...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 4–7, 2007
Paper Number: SPE-109070-MS
... isolation liner assembly drilling fluid chemistry drilling fluid property completion equipment service tool check valve spe 109070 society of petroleum engineers Upstream Oil & Gas cement inner string placement gravel drilling fluid formulation closing sleeve zonal isolation production...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 4–7, 2007
Paper Number: SPE-108331-MS
... installation and operations casing and cementing specification monobore liner extension operator contingency spe 108331 society of petroleum engineers petroleum engineer hole size assembly monobore liner extension system Introduction In September 2006, BP and Baker Oil Tools achieved...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-96575-MS
... data application bit selection unconfined compressive strength basalt sequence steerable turbodrill ucmp impreg bit drilling operation basalt rock bit stringer basalt section assembly upstream oil & gas strength spe 96575 thickness turbodrill compressive strength rop...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-96282-MS
... reduction in fluid losses to the formation and a reduction in overall casing exit time. Following the casing exit, the build and lateral drilling assemblies were deployed through the window at the first attempt, allowing uninterrupted progression to the under balanced drilling phase. This technology has...
Proceedings Papers

Paper presented at the SPE Offshore Europe Oil and Gas Exhibition and Conference, September 6–9, 2005
Paper Number: SPE-96343-MS
... metal junction approach that was chosen is explored and the installation sequence detailed. Finally, the results and lessons learned during the installation process and future status are addressed. assembly junction drilling operation diverter installation multilateral system requirement...

Product(s) added to cart

Close Modal