Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-3 of 3
Keywords: Clair Field
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 3–6, 2013
Paper Number: SPE-166649-MS
... during 2012. A large site survey in the Clair field (West of Shetland) required the acquisition of High Resolution (HR) seismic data within 8km of an Ocean Bottom Cable (OBC) seismic survey. At this range, acoustic interference between the two geophysical systems is significant. Avoiding acoustic SIMOPS...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 8–11, 2009
Paper Number: SPE-124464-MS
.... The results of this study were used to plan an Extended Reach Drilling (ERD) development well targeting a previously undeveloped part of the Clair field. The new well was successfully drilled, cased and brought on stream within budget, in 2009. This paper describes the basic geology of the field, rock...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Offshore Europe Oil and Gas Conference and Exhibition, September 4–7, 2007
Paper Number: SPE-108435-MS
... to confirm the next stage of development of the Clair Field. Reservoir connectivity and the risk of compartmentalisation are key uncertainties for development of the Clair reservoir (ref.1). On completion of testing operations, the well would typically have been permanently abandoned and of no further value...