ABSTRACT
The laying and coupling of subsea flowline bundles is an important feature of subsea oil and gas production systems. A critical part of the operation is the final pull-in, alignment and connection of the flowline to fixed seabed production structures.
This paper traces the development of equipment to accomplish the diverless connection of flowlines and control lines and the field experience to date.
Keywords:
flowline,
orientation,
clamp assembly,
pull-in tool,
bundle,
pull-in adaptor,
hub,
diverless subsea flowline,
adaptor,
upstream oil & gas
Subjects:
Pipelines, Flowlines and Risers
Copyright 1983, Society of Petroleum Engineers of AIME
You can access this article if you purchase or spend a download.