Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-5 of 5
Keywords: accident
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Using Simple Analytical Approach in Estimating Remaining Resources and Evaluating a Long Shut-In Reservoir Compartment with Too Many Uncertainties
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the North Africa Technical Conference and Exhibition, April 15–17, 2013
Paper Number: SPE-164682-MS
... Abstract M8 Complex is one of the hugest and oldest offshore platforms in Gulf of Suez, Egypt . Many Intensive studies are conducted to refurbish it after its accidental fire occurred in March 2004 destroying most of its structure parts in a try to reinstate its production (±5000 BOPD). M8...
Proceedings Papers
Integrating New Technology Utilizing Risk Management
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the North Africa Technical Conference and Exhibition, April 15–17, 2013
Paper Number: SPE-164684-MS
... of 1250 tons and a variable deck load of 20,000 tons. This paper attempts to demonstrate how implementing a risk management plan during the design and construction of such rigs can help reduce risks associated with major accidents and downtime. This can be accomplished by applying the results of the risk...
Proceedings Papers
Proactive Tools to Enhance Drilling Safety Performance
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the North Africa Technical Conference and Exhibition, April 15–17, 2013
Paper Number: SPE-164647-MS
... for the past five years, reaching 0.52 TRIR in 2011 and 0.60 in 2012 and 0.09 LTIF in 2008 and 2010; the lowest in ADCO Drilling history through effective communication culture. In 2012 the Vehicle Accident Frequency went down to 0.1 with the implementation of the ADCO 9 Life Protection Rules with particular...
Proceedings Papers
Real Accident Cost
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the North Africa Technical Conference and Exhibition, April 15–17, 2013
Paper Number: SPE-164752-MS
... Abstract An accident does not happen. It is always the direct result of someone somewhere sometime did something or failed to do something that was wrong or, some equipment for some reason did not work properly. Whenever there is an accident there is a definite sequence of related factors...
Proceedings Papers
Temsah Field PLEMS Replacement - Challenges & Technology
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the North Africa Technical Conference and Exhibition, February 14–17, 2010
Paper Number: SPE-128836-MS
.... Following the Temsah NW accident, it was of paramount importance to recover the Temsah and Akhen fields' production with a fast track redevelopment project. To match a challenging production restart up (6 months for Akhen) temporary gas and condensate PLEMs were installed in the field. Such PLEMs, procured...