1-20 of 22
Keywords: liner
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, September 17–18, 2024
Paper Number: SPE-221436-MS
... for kick circulation, such as Influx Management Envelope (IME) and the MPD matrix, there is still a literature gap regarding kick management with the bit off bottom - a common scenario during tripping, reaming, mud displacement, or running liners. The identification and control of a kick with the bit off...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, September 17–18, 2024
Paper Number: SPE-221433-MS
..., such as losses, ballooning, and wellbore instability. MPD was selected as an enabler for overcoming these challenges. The sidetrack was planned to exit the existing 14-inch casing and run three additional strings of casing/liners to a planned total depth (TD) over 31,000 ft MD. MPD was strategically integrated...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, September 17–18, 2024
Paper Number: SPE-221428-MS
.... geology well control cement plug managed pressure drilling drilling fluid management & disposal backpressure annular pressure drilling pressure pore pressure test wellbore technique deep disposal well liner dynamic pore pressure test geologist drilling fluids and materials pore...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, September 17–18, 2024
Paper Number: SPE-221446-MS
... control geologist liner reservoir geomechanics spe iadc-221446-ms mpc schedule remedial cement operation geological subdiscipline workstring geology Introduction This project consisted of drilling four wells in GOM with a water depth of approximately 5,900 ft and a total average depth...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling & Underbalanced Operations Conference & Exhibition, September 27–28, 2022
Paper Number: SPE-210543-MS
... Abstract This case study shows how three highly depleted reservoirs with large negative drilling windows, previously considered un-drillable, were safely entered by combining Managed Pressure Drilling (MPD) and drill-in liner technologies with a novel losses response strategy. The challenge...
Proceedings Papers

Paper presented at the IADC/SPE Managed Pressure Drilling & Underbalanced Operations Conference & Exhibition, September 14–16, 2021
Paper Number: SPE-206394-MS
... hole pressure. MPD system was used to drill 8-1/2" section of ZX well smoothly to target depth and geological objective was achieved without NPT. MPD cementing was performed successfully for 7" liner operation. This was the first managed pressure cementing (MPC) operation in offshore Madura...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, October 29–30, 2020
Paper Number: SPE-200519-MS
... to combine surface modeling with downhole measurements during the actual drilling phase utilizing data sent to surface by mud pulse telemetry. However, during liner running and cementing operations this data is generally not available. Due to the narrow annular clearances around the liner and the heavier...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, October 29–30, 2020
Paper Number: SPE-200517-MS
... casing string, before drilling the target reservoir, a short production casing liner is hung from the fully rated sour service intermediate string, and tied back after the reservoir section has been drilled and a production liner run. This greatly reduces drilling circulating pressure losses...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, April 17–18, 2018
Paper Number: SPE-190006-MS
... conventionally, which made this well particularly a good MPC candidate. After reaching the liner point, the well was displace to kill fluid (~155 pcf) in stages. The liner was then conveyed to bottom conventionally which resulted in lost circulation during breaking the gel of this high mud at high pressures...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition, April 17–18, 2018
Paper Number: SPE-189996-MS
... schedule geometry Upstream Oil & Gas liner cement placement operation casing and cementing cement mud weight spacer annular pressure drilling displacement mud density SBP pressure assist rheology pump pressure equation annular friction pressure friction pressure well control...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition, April 13–14, 2015
Paper Number: SPE-173812-MS
... managed pressure cementing (MPC) for the liners. SDX well was successfully drilled to TD after overcoming defying wellbore challenges due to narrow window, pore pressure ramp uncertainty and HPHT condition. MPD was fully utilized to drill four most critical sections. MPC was performed splendidly for 11...
Proceedings Papers

Paper presented at the SPE/IADC Managed Pressure Drilling & Underbalanced Operations Conference & Exhibition, April 8–9, 2014
Paper Number: SPE-168945-MS
... was introduced as the best solution for drilling into the well objectives. During the planning stage, different scenarios were analyzed based on the formation fracture gradient (FG) and pore pressure (PP) estimations. MPD plans were designed based on statically underbalanced mud while drilling, running the liner...
Proceedings Papers

Paper presented at the IADC/SPE Managed Pressure Drilling and Underbalanced Operations Conference & Exhibition, February 12–13, 2009
Paper Number: SPE-122204-MS
... drilled six wells in a highly faulted section of the North Field in the last three years. All wells experienced losses during either the drilling or liner cementing portion of the 12¼-in. hole section. Two of the wells experienced massive lost circulation events in the Arab zone that could not be stopped...
Proceedings Papers

Paper presented at the IADC/SPE Managed Pressure Drilling & Underbalanced Operations, March 28–29, 2007
Paper Number: SPE-108339-MS
... the surface. The upper completion was run with crude in the hole to ensure that no brine should contact the formation. To perforate underbalanced with a drilling rig, the well was constructed with a 7" liner at the start of the build section to total depth of the well. A 7" tie-back was run with a surface...

Product(s) added to cart

Close Modal