Development of UPPER ZAKUM Field entails the use of an advanced computerised control system. The system comprises SCADA; Distributed Control System (DCS) and Programmable Logic Controllers (PLC).

The system provide the operators with an efficient and flexible tool for remote and automated operations; featuring economical cost, reliable control and better operating performance.

After arranging in depth training for the operational and maintenance groups, the operating personnel accepted the system and continued to operate it efficiently.

You can access this article if you purchase or spend a download.