Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 26
Keywords: placement
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Implementing a Specialized Combined Cement-Resin System to Mitigate Dump Flood Mechanism During Plug and Abandonment
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 27–29, 2025
Paper Number: SPE-225657-MS
... differential through the casing, resulting in the displacement of the oil. For well abandonment, conventional slurry systems can be easily diluted during placement when they come into contact with flowing water. The primary purpose of using a special combination of cement slurry and resin was the well-known...
Proceedings Papers
Enhanced Zonal Isolation Across High Permeable Formations by Implementing a Reactive Solution System
Available to PurchaseM. S. Abdellatif, K. K. Andrews, A. S. Elhassan, K. A. Abdala, A. E. Hamidzada, M. Borovykh, P. Manga, N. S. Alramahi
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 27–29, 2025
Paper Number: SPE-225663-MS
... Abstract Achieving zonal isolation through cementing is a complex process that requires a combination of slurry design and precise cement slurry placement procedures. To address this complexity, it is essential to help ensure that the cement slurry design meets the specific parameters required...
Proceedings Papers
Advancing Low Carbon Drilling Solutions: Achieved Emission Reduction and Maintain Operational Efficiency in the 1 st Green Well in UAE
Available to PurchaseY. Al Hosani, A. Dua, S. Imam, D. N. Sandra, M. Hussain, G. Salem, A. M. Bin Shamlan, A. Sumaida, M. S. Al Marzouqi, F. Saleh, Z. Mushtaq, M. Al Nuaimi, W. Fares, B. Saeed, A. Geith, L. Al Marzouqi
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 27–29, 2025
Paper Number: SPE-225727-MS
... electronics, advanced sensors, downhole processing power, and high-speed telemetry systems. The processing power, along with multiple wellbore survey packages, provides precise steering control for accurate wellbore placement in the dynamic drilling environment seen down hole. This smart system was designed...
Proceedings Papers
Using Ultrasonic Flexural Measurements to Validate Casing Standoff Simulations: A Kuwait Case Study
Available to PurchaseAhmed Nour, Lulwa Al-Suwailem, Dalal Al-Jutaili, Ken Monteiro, Sarah Al-Safran, Martijn Bogaerts, M. Aiman Fituri, Mischa Oostendorp, Mohamed Khalil
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 23–25, 2023
Paper Number: SPE-214538-MS
... casing rotation and reciprocation if needed. The project focused on the full design-execute-evaluate (D-E-E) cycle to cover any lessons learned. It consisted of four parts: Centralizer selection Centralizer placement and standoff simulation Centralizer installation Standoff evaluation...
Proceedings Papers
Curing Hydrodynamic Instability During Balanced Plug Cementing
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 23–25, 2023
Paper Number: SPE-214577-MS
... any function. The placement of a balanced plug is feasible. However, a high-density fluid above a lighter fluid is not stable. The phenomenon is known as Rayleigh-Taylor instability. In principle, to be reasonably stable, the interface must be horizontal. The longer the interface is, the more unstable...
Proceedings Papers
Rigless Solution in Replacement of Rig Intervention
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 23–25, 2023
Paper Number: SPE-214579-MS
... chemistry well decommissioning uae government completion installation and operations climate change cement property upstream oil & gas drilling operation cement formulation cement abandonment footprint intervention portman technology conference placement drilling rig liquid freefall...
Proceedings Papers
Optimizing Cementing Practices for Onshore Linerless Extended Reach Drilling Wells in the United Arab Emirates
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 23–25, 2023
Paper Number: SPE-214575-MS
... considerations Downhole tool limitations (Build up rate, Bending Moment, Temperature, Vibration, SS limits) Torque and Drag Management (Weight transfer, friction factor, Jar placement) Casing Wear Hole Cleaning, ECDs and Losses Management Wellbore Stability, Stuck Pipe Avoidance and Mitigation...
Proceedings Papers
Implementation of a Permanent Well Barrier Across Triple Casing 7-Inch × 9-5/8-Inch × 13-3/8-Inch Casing in Record Time for the Customer, Saving 4.4MMUSD and 17 Days of Rig Time
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 23–25, 2023
Paper Number: SPE-214617-MS
... underreamer configuration run summary hrsm international association underreaming placement drilling contractor Introduction This paper involves advancement of key technologies from a well abandonment standpoint. The objective from the client was to isolate a production zone by removing casings...
Proceedings Papers
The Axial Agitation System Effect on Rotary Steerable Drilling: ADNOC Offshore Mature Field Case Study
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, May 25–27, 2021
Paper Number: SPE-202080-MS
... costs for the downhole tools. united arab emirates government friction exhibition drilling operation drilling parameter bha offset well directional drilling offset dm log rotary steerable drilling axial agitation system effect mse placement higher drilling efficiency case study...
Proceedings Papers
Unlocking the Economic Potential of a Mature Field Through Rigless Remediation of Microchannels in a Cement Packer Using Epoxy Resin and Ultrafine Cement Technology to Access New Oil Reserves
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, January 29–31, 2018
Paper Number: SPE-189350-MS
... in the annulus of the production tubing and casing to isolate the producing zone) and discusses laboratory development of a customized epoxy resin system, simulations to estimate channel size, three-dimensional (3D) displacement modeling, drillout after placement, and evaluation post-placement. An epoxy resin...
Proceedings Papers
Achieve Demanding Targets: Successful Well Placement With No Harm to the Environment. Case Study from Offshore Abu Dhabi
Available to PurchaseS. M. Al-Jaberi, M. M. Amer, J. Marrauld, Y. Yuliandri, S. Al-Braik, I. Baca Espinoza, M. Shoukry, T. K. Hammad, A. Jaorawala, U. Herz, H. El Masry, K. Saravanakumar, S. Potshangbam
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, January 26–28, 2016
Paper Number: SPE-178238-MS
... acquisition that played a significant part in facilitating effective geosteering and well placement. Real-time NMR total porosity was critical to confirm optimum well placement, especially where lateral facies variations were expected and due to the limited availability data for such a green field...
Proceedings Papers
Successful Use of Abrasive Tubing Punch Technology for Highly Deviated Wells in Saudi Arabia
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, January 26–28, 2016
Paper Number: SPE-178228-MS
... of drilling contractors placement lock mandrel RIH packer means Well X: Introduction Well X was drilled and completed as an openhole horizontal in an oil bearing formation. An 8 1/2-in. section was directionally drilled to 8,746 ft measured depth (MD) with maximum inclination of 90.86° at 8,441...
Proceedings Papers
An Integration of Drilling/Completion Technologies for Maximizing Long-Term Productivity
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, January 26–28, 2016
Paper Number: SPE-178237-MS
... than 1,000 packers run on variety of wells, including runs in excess of 20,000 ft and laterals exceeding 10,000 ft in tri-lateral and penta-lateral wells. gauge hole Exhibition centralizer placement Directional Drilling friction drilling completion technology application Upstream Oil...
Proceedings Papers
China Shale Gas Exploration: Early Sichuan Basin Longmaxi Shale Gas Stimulation and Completion Case Study
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference & Exhibition, October 7–9, 2013
Paper Number: SPE-166746-MS
... stimulation complex reservoir spe iadc 166746 Upstream Oil & Gas fracture fissure system hydraulic fracturing Sichuan Basin plug proppant shalelog longmaxi shale gas stimulation fracture deformation natural fracture fissure China Exhibition exploration placement job chart gradient...
Proceedings Papers
New Vertical Drilling System Brings Real Time Survey and RSS Performance While Reducing Overall Operating Costs
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference & Exhibition, October 7–9, 2013
Paper Number: SPE-166732-MS
... and equipment autonomous inclination survey system ROP bring real time survey international association of drilling contractors placement information rotation driller power section drilling operation deviation rss performance society of petroleum engineers herrington survey tool inclination...
Proceedings Papers
A New Integrated Drilling and Fracturing Solution for Tight Oil Exploration: A Case Study from Central China
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference & Exhibition, October 7–9, 2013
Paper Number: SPE-166762-MS
... with permeability less than 0.2 md. The integrated solution included a horizontal well drilled with real-time image and near-bit measurements for accurate and timely well placement decisions, well placement technology for trajectory optimization, multistage fracturing technology to stimulate the tight reservoir...
Proceedings Papers
Hybrid Bit Technology Expands Application Range in Harsh Rock Environments
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling Technology Conference & Exhibition, October 7–9, 2013
Paper Number: SPE-166766-MS
... and low drillability. By fusing existing technologies such as PDC and diamond impregnated cutting structures, designers have improved existing designs so they feature both optimized cutting element placement for extending bit durability and an engineered mix of diamond impregnated material strategically...
Proceedings Papers
New Approach to Drilling and Completing Horizontal Wells in Extremely Shallow and Unconsolidated Reservoirs
Available to PurchaseShahryar Saebi, Timo W. Staal, Graeme Dawson, Dennis Miguel, Robert Ooms, Chris Shield, Mohd Razali Paimin
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Middle East Drilling Technology Conference & Exhibition, October 26–28, 2009
Paper Number: SPE-125508-MS
... the development project, the candidate well was drilled successfully, with the directional, well placement, and completion requirements being achieved. In addition, the application of new sand control technologies coupled with specifically engineered procedural solutions assured sand-free production at a rate...
Proceedings Papers
Plug-Setting Aid Retooled for Uphole-Downdip Plugback Application Enables Pinpoint Slurry Placement in Complex Updip Wellbore
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the Middle East Drilling Technology Conference & Exhibition, October 26–28, 2009
Paper Number: SPE-125446-MS
.... Detailed customer expectations and performance criteria will be provided, resulting in a conventional plug-setting aid that was successfully retooled to enable slurry placement in an uphole-downdip wellbore. drilling fluid management & disposal casing and cementing plug drilling fluids...
Proceedings Papers
Applied Newly Developed Technology to Overcome Deepwater Completion Difficulties
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Middle East Drilling and Technology Conference, October 22–24, 2007
Paper Number: SPE-108261-MS
... with the whipstock added extra stress to the screen system, pushing the OD of the system hard against the casing opening for a worst-case scenario. Abstract A major issue for the deepwater high-rate gas completions in the Simian/Sienna field off the coast of Egypt was the placement of an effective sand-control...
1