To obtain the major benefits of having a long open hole completion with maximum multiple reservoirs contact, full control and optimization over the flow without coil tubing intervention have become a challenge for the operators. This paper presents a step change in the engineering for optimizing oil production across multiple reservoirs by deploying the first mono-bore smart completion technology with four inflow control valves, swell packers and permanent downhole gauges across an open hole horizontal reservoir drain of 4,600 feet in ADNOC Group Fields.

You can access this article if you purchase or spend a download.