1-9 of 9
Keywords: Drillstem Testing
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192479-MS
.... log analysis downhole intervention production enhancement Well Intervention Upstream Oil & Gas Completion Installation and Operations completion equipment connector cable deployable esp lubricator well logging Drillstem Testing drillstem/well testing ESP Wellhead power cable...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192510-MS
... performed using temporary completions in the form of drillstem tests (DST), or using permanent completions and permanent downhole gauges or slickline-deployed gauges set in a nipple in the lower completions tubing. While well tests are valuable for any well, such operations are not systematically performed...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192516-MS
.../well testing anchor srp pump SRP artificial lift method installation replacement society of petroleum engineers intake pressure anchor pump anchor insert pump Drillstem Testing completion assembly special implementation srp pump Introduction Once an artificial lift pump fails...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184190-MS
... scenarios are discussed in the present paper, showing that an incremental oil production of up to 27.9% could be obtained depending upon the operational constraints. production monitoring Drillstem Testing constraint Reservoir Surveillance Upstream Oil & Gas drawdown production control...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184205-MS
... of the pump was unchanged to keep the CAPEX at low. In addition, further production of 200,000 BBLS is expected through the jet pump. production monitoring Drillstem Testing production control hydraulic jet pump artificial lift system multiphase pump real time system Reservoir Surveillance...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184216-MS
... multiphase flow behavior tailpipe unstable performance Drillstem Testing drillstem/well testing Simulation completion intake backpressure right picture installation fluctuation ESP Completion field data Introduction A wide range of artificial lift methods is used to increase oil...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184217-MS
... gas lift concentration production control gas injection capillary string foam concentration gas lift step enhanced recovery Upstream Oil & Gas lift gas rate injection rate period optimum foam concentration injection application foam injection drillstem testing Foam Injection Rate...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184218-MS
... hydraulic jet pump Upstream Oil & Gas Completion Installation and Operations multiphase pump Drillstem Testing production monitoring jet pump long string application bottomhole pressure SSD downhole jet pump short string water cut wellhead pressure candidate well production rate nozzle...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition, November 27–28, 2012
Paper Number: SPE-163114-MS
.... Finally, a brief summary of the key conclusions and plans forward will be shared. drillstem testing flow period target reservoir waterflooding precipitation enhanced recovery drillstem/well testing water flood project subject reservoir production data producer well evaluation...

Product(s) added to cart

Close Modal