Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-4 of 4
Keywords: diameter
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Effectiveness in Heavy Oil Wells Cleaning at Boscan Field With Cyclone Bailer and Coiled Tubing Unit
Available to PurchaseWendy Leal, Maria Rodriguez, Florelia Chirinos, Carlos Mustone, Gustavo Mogollon, Zulay Vilchez, Marianh Rodriguez, Francisco Arteaga, Henrut Pirela
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Latin America and Caribbean Heavy and Extra Heavy Oil Conference, October 19–20, 2016
Paper Number: SPE-181199-MS
... in several occasions reached up to 1.5 feets in length, too big to pass by annular space between inner diameter of liner and outer diameter of coiled tubing (CT) and the debris were too heavy to be lifted using fluids energized with nitrogen. It is important to highlight that during the first run of well...
Proceedings Papers
A Low-Cost Completion Technique for Simultaneous Steam and CO 2 Injection in Heavy Oil Reservoirs
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Latin America and Caribbean Heavy and Extra Heavy Oil Conference, October 19–20, 2016
Paper Number: SPE-181194-MS
...-deploying, easily retrievable", without elastomeric components. The tool "works on a principle similar to piston rings in a combustion engine". Because of the RSP being made of an alloy steel, it was naturally more resistant to high temperatures. Additionally, the rings had a slightly larger diameter than...
Proceedings Papers
Compact and Highly Efficient Heat Exchanger Based on Packed Beds of Nanoparticle-Doped Spheres
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Latin America and Caribbean Heavy and Extra Heavy Oil Conference, October 19–20, 2016
Paper Number: SPE-181179-MS
.... The porosity ɛ of the medium is assumed to be constant throughout the bed. Wall effects are considered in the model although they are not significant for D/d >10, D corresponding to the tube inner diameter and d to a single solid sphere nominal diameter. The specific surface area S is calculated using...
Proceedings Papers
Assessment of Cold-Heavy-Oil Production With Sand CHOPS in Llanos Basin, Colombia
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Heavy and Extra Heavy Oil Conference: Latin America, September 24–26, 2014
Paper Number: SPE-171051-MS
... rates using big hole perforations in vertical wells without sand control. By letting the sand be produced in conjunction with the oil, the so called “wormholes” can be created within the reservoir. These wormholes are structures of about 1 inch diameter that can reach several meters of length beyond...