1-20 of 36
Keywords: sand control
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, July 27–31, 2020
Paper Number: SPE-199110-MS
... characterization sand control sand production information depletion fluid level production formation production rate sand production event diagnostic diagram well 1 gravel pack colombian field flow assurance completion installation and operations resistance drag force water intrusion water cut...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, July 27–31, 2020
Paper Number: SPE-199062-MS
... The discovery of Rubiales dates back to 1980 and since then it has been developed up until 2006, when it came to full production ( Florez Anaya and Osorio, 2014 ). The sand control completion strategies in Rubiales wells are mainly cased hole and openhole gravel packing for vertical and deviated...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, July 27–31, 2020
Paper Number: SPE-199019-MS
... flexibility into development plans and being prepared for contingencies have been the other critical learnings from this project geologic modeling reservoir characterization wellbore integrity wellbore design controls and umbilicals sand control screen selection strategic planning and management...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 17–19, 2017
Paper Number: SPE-185525-MS
... suitable downhole sand control method becomes necessary; grain size analysis, sand sorting ratios, reliability, productivity are evaluated to identify the optimal sand control technique. Finally, a sand production comparison for Hollin Formation in Ecuador is performed. The initial section of the paper...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, November 18–20, 2015
Paper Number: SPE-177088-MS
... for sand control and forced convection to minimize fluid heat transfer through the tubing, allowed to produce high viscosity fluids. artificial lift system Upstream Oil & Gas ml sand sand control sand production Pañacocha field molecule heat transfer society of petroleum engineers...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 21–23, 2014
Paper Number: SPE-169324-MS
... generate changes in the gravel sorting which could result in in-situ gravel not being effective in constraining sand from flowing into the wellbore. After the matrix fails, sand particles can then be carried by the produced fluid to the wellbore; however, if a sand control completion is in place...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 21–23, 2014
Paper Number: SPE-169259-MS
... evaluation, optimization of well parameters, oriented and selective perforation, and production optimization by controlling drawdown through the wellbore life cycle. The main purpose of any sand control method is to hold load bearing solids in the place. It is therefore necessary to determine what is in...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 21–23, 2014
Paper Number: SPE-169237-MS
... equilibrium height Upstream Oil & Gas calculation sand bed drilling operation concentration sand carrier fluid sand control sand-bed height gravel pressure gradient conservation equation equation two-phase flow flow rate equilibrium sand-bed height wellbore The gravel packing...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 21–23, 2014
Paper Number: SPE-169376-MS
... alternative technique and do a good sand control, the solution may not be optimal from the economic standpoint. A good decision making process considers other alternatives for sand control, such as handling the drawdown pressure, which in some cases proves to be a technical and economic alternative...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 21–23, 2014
Paper Number: SPE-169397-MS
.... Table 4 shows the results of granulometric and mineralogy characterization of these intervals. Table 3 Sand intervals for Bonanza 38 and 39 Table 4 Granulometric and mineralogy for intervals in Bonanza 25 As an alternative to sand control in Bonanza field, a...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, May 21–23, 2014
Paper Number: SPE-169440-MS
.... Screen Selection shunt system exit port assembly drilling operation completion tube system Directional Drilling jumper tube shroud test sample reliability sand control shunt tube system gravel proppant Upstream Oil & Gas test setup centralizer transport tube society of petroleum...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, April 16–18, 2012
Paper Number: SPE-152887-MS
... results obtained in this study are shown. modeling & simulation sand production spe 152887 sand control exclusion information reservoir characterization frequency intervention job execution gravel pack diagnostic diagram well lisama 166 lisama 166 society of petroleum engineers...
Proceedings Papers

Paper presented at the SPE Latin America and Caribbean Petroleum Engineering Conference, April 16–18, 2012
Paper Number: SPE-152885-MS
... sand control job, etc. Abstract Sand production is a critical problem that causes the industry spending over $3.0 Billion U.S. per year (70% of the wells worldwide have this problem). To mitigate the impact, many operators choose the option of deploying technologies to exclude the sand, and...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, December 1–3, 2010
Paper Number: SPE-136999-MS
... technique for controlling sand production is recommended as soon as it is known that the problem exists. Among some of the solutions available are 1) sand control by mechanical means using slotted liners and screens combined with conventional gravel packs, 2) prepacked completion screens, 3) lowering the...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, December 1–3, 2010
Paper Number: SPE-138264-MS
... Abstract The use of drill-in-fluid (DIF- sized salt system treated with enzyme breaker) during drilling and completion operations in the reservoir section contributed to the improvement in wellbore productivities especially desired in open hole completion where sand control using stand alone...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, December 1–3, 2010
Paper Number: SPE-138589-MS
... Fig 2 Evolution of Sand Control Techniques and IP's at Ocelote field. As following step, use of ultra light weight gravels and special tools were studied and decided to use so that, working in joint form, would allow obtaining the wished results. In addition to the pumping...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, December 1–3, 2010
Paper Number: SPE-139360-MS
... Abstract Today's conventional sand control screens, such as slotted liner, wire wrap, and premium mesh (both fusion-bonded or "soft-sintered"), retain sand via arrays of single-sized gaps. Although open flow area and mechanical strength differ among such screens, the sand retention mechanism is...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, December 1–3, 2010
Paper Number: SPE-139460-MS
..., an efficient sand control method is mandatory to protect the ESP. An additional challenge is that the well will cross the sandstones horizontally, due to the well geometry necessary to achieve the interception. Usually, the operator's first option would be an OHHGP. This solution however became...
Proceedings Papers

Paper presented at the Latin American and Caribbean Petroleum Engineering Conference, May 31–June 30, 2009
Paper Number: SPE-121930-MS
.... In Campos basin a large number of wells completed with sand exclusion systems (sand control wells) are on stream for seven years or more. Establish the MSPR for these wells, considering various degrees of degradation, is also a big challenge. This study introduces the concept of completion robustness...
Proceedings Papers

Paper presented at the Latin American and Caribbean Petroleum Engineering Conference, May 31–June 30, 2009
Paper Number: SPE-122064-MS
... Directional Drilling deposition drilling operation ECP flow rate multizone completion project Upstream Oil & Gas criteria ecp gravel wall shear stress Pump Rate diameter Completion Project design placement methodology shear stress sand control dune surface Simulation...

Product(s) added to cart

Close Modal