1-2 of 2
Keywords: delay time
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, November 18–20, 2015
Paper Number: SPE-177136-MS
... in Block 15. A new completion procedure using anchored guns with dual concentric completion is also described. Upstream Oil & Gas static underbalance ESP dynamic underbalance block 15 current practice delay time sequence productivity overbalance dual concentric completion dual...
Proceedings Papers

Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, December 1–3, 2010
Paper Number: SPE-138366-MS
... Abstract In the laboratory, partially water-wet systems are often mistaken for completely oil-wet systems, because imbibition only starts after removal of the oil layer, which originally covers the grains. The (long) time required to remove the oil film will be referred to as delay time...

Product(s) added to cart

Close Modal