This paper describes a single well pilot in which light oil diluent was injected through tubing to lower in-situ oil viscosity and increase production from a low gravity oil well. The pilot well is located on the Heritage platform in the Santa Ynez Unit and produces from the Monterey formation. The pilot validated laboratory data which suggested that large production rate increases could result from high rate diluent injection.

You can access this article if you purchase or spend a download.