ABSTRACT
A new method of steamflooding has been suggested which uses staggered scheduling of oscillations in injection and production among the various injectors and producers in a project. Simulation results show that the proposed method can increase oil production over the base case of no oscillation by 2-8 %.
Copyright 1993, Society of Petroleum Engineers
You can access this article if you purchase or spend a download.