1-2 of 2
Keywords: fabrication
Close
Sort by
Proceedings Papers

Paper presented at the International Petroleum Conference and Exhibition of Mexico, March 3–5, 1998
Paper Number: SPE-39850-MS
... on location with a Semi-Submersible Construction Vessel. This installation method was used to avoid the typical launch framing required for jackets in this water depth. This launch framing accounts for approximately 20% of a typical launched jacket weight. The jacket fabrication schedule is also reduced due...
Proceedings Papers

Paper presented at the International Petroleum Conference and Exhibition of Mexico, October 10–13, 1994
Paper Number: SPE-28680-MS
... operation upstream oil & gas deepwater gulf of mexico fabrication auger tension leg platform diameter seafloor subsea system drilling houston tlp knowledge installation tendon hull INTRODUCTION Shell's "Auger" project is a TLP in 2,860 feet of water in the Gulf of Mexico...

Product(s) added to cart

Close Modal