This paper will describe a new sand control method used in an area of Ecuador, South America where workover rigs are not readily available. Sand production had been significantly affecting maintenance costs on surface and downhole production equipment and had impacted performance of the downhole jet pump, subsequently causing a decrease in well production. By installing a small-diameter, sintered metal gravel-pack screen across the perforation interval and placing the gravel-pack sand with coiled tubing, the sand production was successfully controlled. The procedure and equipment used to perform this technique as well as post job data that provide results obtained will also be presented. Noteworthy advantages, such as recompletion without removal of the existing production completion string and without use of a workover rig, will also be discussed.

You can access this article if you purchase or spend a download.