This paper discusses the development and operational experience of the Snorre Through Flow Line (TFL) system. Included is a review of the TFL system development, installation, qualification and commissioning. Practical experiences, TFL operation and the development of a TFL logging tool are also discussed. Continuity and enthusiasm of personnel have resulted in a high quality, well qualified TFL system, enabling a wide range of operations to be performed.

You can access this article if you purchase or spend a download.