1-7 of 7
Keywords: packer
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference & Exhibition, April 1–3, 2014
Paper Number: SPE-167858-MS
... Upstream Oil & Gas Artificial Intelligence ledger completion equipment borehole application packer Wellbore Completion completion configuration configuration operator Witsml Wellhead completion assembly contact interval wellbore completion data-object Drilling Introduction...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-149602-MS
... valve production control upstream oil & gas completion sensor instrumentation intensity application packer fiber optic diagram installation production logging society of petroleum engineers information fiber cable acoustic signal Introduction Fiber optics based sensing has...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference and Exhibition, March 23–25, 2010
Paper Number: SPE-127593-MS
... in order to maximize both drawdown and pump intake pressure (PIP) to enhance gas handling performance. – A deep set packer and tubing retrievable subsurface safety valve (TRSSSV) below the ESP provide the second mechanical barrier, with the packer being part of the permanent lower completion...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, February 25–27, 2008
Paper Number: SPE-111484-MS
... Monitoring Systems/Intelligent Wells intelligent completion technology application reliability discrepancy quality requirement intelligent completion system packer completion equipment supplier commodity premium market customization society of petroleum engineers Upstream Oil & Gas spe...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, April 11–13, 2006
Paper Number: SPE-99948-MS
... To simplify running procedures, the module for each interval (composed by a valve, a mandrel and a packer) are pre-assembled during the system integration tests (SIT) that are performed before running the completion. On the top of the assembly of the topmost interval is placed the production...

Product(s) added to cart

Close Modal