1-7 of 7
Keywords: completion equipment
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference & Exhibition, April 1–3, 2014
Paper Number: SPE-167858-MS
... Upstream Oil & Gas Artificial Intelligence ledger completion equipment borehole application packer Wellbore Completion completion configuration configuration operator Witsml Wellhead completion assembly contact interval wellbore completion data-object Drilling Introduction...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-150408-MS
... flow modelling, erosion analysis, tool selection, and crossover control, and how we expect the future movement of this technology to evolve. completion installation and operations upstream oil & gas intelligent well completion equipment directional drilling completion completion...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, February 25–27, 2008
Paper Number: SPE-111484-MS
... Monitoring Systems/Intelligent Wells intelligent completion technology application reliability discrepancy quality requirement intelligent completion system packer completion equipment supplier commodity premium market customization society of petroleum engineers Upstream Oil & Gas spe...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, February 25–27, 2008
Paper Number: SPE-112226-MS
... valve well completion smart well completion Downhole Valve interface intelligent well remotely operated smart well completion asset and portfolio management operator completion equipment real time system completion monitoring systems/intelligent wells Introduction Haradh-III field...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, April 11–13, 2006
Paper Number: SPE-99948-MS
... to be replaced without the need of retrieving the tubing and, therefore, the intelligent completion equipments. The pump is placed above the gas separator. The tubing hanger and the wellhead for these wells are also equipped with feedthroughs to pass all hydraulics and optical lines. The hydraulic line...

Product(s) added to cart

Close Modal