1-20 of 29
Keywords: completion
Close
Sort by
Proceedings Papers

Paper presented at the SPE Intelligent Energy International Conference and Exhibition, September 6–8, 2016
Paper Number: SPE-181012-MS
... Abstract Deepwater operators continually face technical and environmental challenges to drilling and completing wells safely and efficiently. To address both current and future challenges, the industry has leveraged radio frequency identification (RFID) technology to reduce risk, rig time...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International Conference and Exhibition, September 6–8, 2016
Paper Number: SPE-181031-MS
.... In the latter, the water cut will be a function of the drawdown if the completion intercepts multiple reservoir layers with varying permeability and water saturation. Beyond the improvements in stability, the drawdown controller provides an effective tool for managing the transients experienced during start...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference & Exhibition, April 1–3, 2014
Paper Number: SPE-167858-MS
... Abstract The new Completion data-object is an XML specification for describing a well completion throughout its life. It is part of the WITSML and PRODML industry data-exchange standards. Using the object, well completion data can be accurately, reliably, and consistently exchanged between...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference & Exhibition, April 1–3, 2014
Paper Number: SPE-167821-MS
... Abstract Interval Control Valves (ICVs) are important tools for managing production challenges such as localized water or gas breakthrough, particularly in multilateral wells and horizontal wells with open-hole completions. This paper describes an automated workflow designed exclusively...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference & Exhibition, April 1–3, 2014
Paper Number: SPE-167863-MS
... of this data, along with the best practices employed in shale plays. Energy Economics cimarex Upstream Oil & Gas completion Artificial Intelligence information Engineer operation production software reporting predictive analytics unconventional resource economics allocation surveillance...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference & Exhibition, April 1–3, 2014
Paper Number: SPE-167876-MS
... operation Upstream Oil & Gas completion conditioning oil ratio reservoir startup Acg Field maintain production water cut optimisation society of petroleum engineers surge azeri-chirag-guneshli field free gas Introduction The ACG field is a giant field produced through five...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference & Exhibition, April 1–3, 2014
Paper Number: SPE-167866-MS
... by making improvement suggestions in all areas moving into the digital oil field. data quality Upstream Oil & Gas real time system accuracy information knowledge wellsite Collaboration completion remote operation work process interpretation transmission field development optimization...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-149641-MS
... data management data quality upstream oil & gas tullow oil reservoir surveillance portfolio completion database joint venture development decision pdc solution tullow allocation workflow reservoir model production control information management spe 149641 reservoir monitoring...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-149602-MS
... in at least parts of the wells. reservoir surveillance injector gas lift valve production monitoring frequency acoustic field production control upstream oil & gas completion production logging information application packer fiber optic sensor fiber diagram cable installation...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-150096-MS
... control using a range of reservoir model realizations, but assumed that the realizations captured all possible production behaviors at the individual well and completion level. In practice, this is usually not the case, for the reasons discussed above. Here, we simulate production using models that lie...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-150138-MS
... with the appropriate algorithms, is turned into real-time information; viz. the quantitative values of the multiphase flow rate distribution across the multiple completion intervals. This transformation of data into information is the first step in a real-time, selective, zonal production management methodology...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-150195-MS
.... Today's practice is to evaluate the IW value chain in a "fit-for-purpose" manner rather than by an integrated modeling workflow. Reservoir engineers still struggle to convince their management of the IW's value, while the well engineer is only consulted immediately before completion deployment. Hardware...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-150408-MS
..., evaluating the successes and non-successes will without doubt determine the future direction for this technology, 2 . Most intelligent completions are very expensive, and it is important to be able to model and predict the performance of these complex systems. Finite difference reservoir simulators can...
Proceedings Papers

Paper presented at the SPE Intelligent Energy International, March 27–29, 2012
Paper Number: SPE-150477-MS
...Problems with Traditional SAGD Systems SAGD injection wells typically have been completed with dual strings in a slotted liner ( Gotawala, et.al., 2009 ). One string ends at the heel, and the other ends at the toe. Steam can be injected independently into either of these strings. Barbell...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference and Exhibition, March 23–25, 2010
Paper Number: SPE-126246-MS
... Abstract Implementations of smart-field strategies with intelligent completions, i.e., interval control valves and interval control devices, are growing in the oil industry. Yet, there is still resistance by some companies because of concerns for (1) provable long-term value in terms of oil...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference and Exhibition, March 23–25, 2010
Paper Number: SPE-127593-MS
... production monitoring drillstem/well testing production control reservoir pressure high gvf Upstream Oil & Gas Efficiency run lives Reservoir Surveillance drawdown completion spe 127593 real time system water cut installation packer flowrate artificial lift system motor...
Proceedings Papers

Paper presented at the SPE Intelligent Energy Conference and Exhibition, March 23–25, 2010
Paper Number: SPE-128653-MS
... Over a dozen high rate DHFC water injectors have since been completed and placed in service indicating the assurance processes associated with the valve technology were successful. However not all the wells are achieving the assets’ goals of dual zone injection. These results provide guidance...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, February 25–27, 2008
Paper Number: SPE-112143-MS
... Abstract Smart completions that can remotely control the flow from multiple layers of a reservoir interval were introduced in the mid 1990's. Downhole flow-control (DHFC), as it has become known, has since been installed in hundreds of wells. However, there has been very little use...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, February 25–27, 2008
Paper Number: SPE-111717-MS
...-making ( Figure-5 ). Leveraged knowledge from Haradh-A12 and similar experiences provided an insight into RTRM implementation capabilities and potential benefits not only in individual well completions but in field development as well. The Haradh Increment-III, for instance, was developed...
Proceedings Papers

Paper presented at the Intelligent Energy Conference and Exhibition, February 25–27, 2008
Paper Number: SPE-112099-MS
... is transported to the facilities in the gas and liquid stream, it will result in erosion of the flowlines and settle in areas of low flow velocities leading to plugging. If the sand is not transported out of the wellbore and remains in the well, the completion interval will gradually "sand up", and production...

Product(s) added to cart

Close Modal