1-6 of 6
Keywords: productivity index
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/CIM International Conference on Horizontal Well Technology, November 6–8, 2000
Paper Number: SPE-65496-MS
... azzouguen spe ps-cim 65496 productivity index directional drilling drilling operation permeability petroleum society reservoir anisotropy Introduction Hassi-Messaoud field has four (04) reservoirs (R3, R2, Ra, and Ri). The Ra is the principal reservoir within 100m of average thickness...
Proceedings Papers

Paper presented at the SPE International Conference on Horizontal Well Technology, November 1–4, 1998
Paper Number: SPE-50432-MS
... rate does not increase with increasing wellbore length when the length exceeds a certain value. The productivity indices per unit length for all segments along horizontal wellbore are not the same. pressure distribution production control productivity index prediction production monitoring...
Proceedings Papers

Paper presented at the SPE International Conference on Horizontal Well Technology, November 1–4, 1998
Paper Number: SPE-50421-MS
... to the horizontal fracture configuration. The performance is compared to that of a "long" horizontal well. dimensionless productivity index reservoir heavy crude production productivity index hydraulic fracturing penetration horizontal well fracture drainage area fracture performance shallow...
Proceedings Papers

Paper presented at the International Conference on Horizontal Well Technology, November 18–20, 1996
Paper Number: SPE-37068-MS
... calculation cumulative recovery slant thickness deviation productivity index drainage spe 37068 skin effect deviation angle well deviation vertical well horizontal well fluid dynamics reservoir thickness anisotropy permeability-anisotropic reservoir permeability reservoir flow...
Proceedings Papers

Paper presented at the International Conference on Horizontal Well Technology, November 18–20, 1996
Paper Number: SPE-37137-MS
... pumps as means of artificial lift. These rates were still below the expected 1000 BOPD predicted. In view of these results and considering the high productivity index measured in these reentry wells, a pilot project was developed, changing the existing lifting system for an electrically driven...
Proceedings Papers

Paper presented at the International Conference on Horizontal Well Technology, November 18–20, 1996
Paper Number: SPE-37112-MS
... a theoretical solution of the productivity index to an empirical multiphase model of the flow in the horizontal section of the well. This program has been tested against actual data from some reservoirs in the Middle East. A good match between the measured and simulated pressures and rates is observed...

Product(s) added to cart

Close Modal