Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 22
Keywords: completion
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
T. Patil, H. Alnuaimi, R. Aljarwan, C. Mascagnini, A. Kuchurin, C. A. McClean, M. Nagarkoti, U. Ahmed
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, April 21–23, 2025
Paper Number: SPE-224543-MS
... mature field artificial lift system aid workflow completion society water production analyse information address production decline sandstone production monitoring reservoir pressure trend identify challenge and device solution production challenge platform Introduction Mature assets...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, April 21–23, 2025
Paper Number: SPE-224675-MS
... of the first deployment of a novel TAML-4 multilateral completion system in a major oilfield in the Middle East. The primary objective is to analyze the methodologies, technologies, and best practices used to address challenges and optimize reservoir access, production efficiency, and overall well performance...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, April 21–23, 2025
Paper Number: SPE-224622-MS
... Abstract This paper describes a solution for leveraging cutting-edge multilateral technology innovations alongside smart completion and lower completion methods to drive substantial improvements in well productivity, flow control, and cost efficiency over a well's life span. This first-of-its...
Proceedings Papers
Abdelrahman Gadelhak, Hammad Mustafa, Ahmed Bazuhair, Mariam Al-Maazmi, Mohamed Omar Al Jawhari, Hour Al-Hosani, Gladwin Corrie, Marwa Al-Menhali, Waleed Al-Harmi, Li Sima, Subin Joseph, Mohammed Alsmael, Syed Aamir, Baraka Al Afeefi, Aiman Fituri
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, April 21–23, 2025
Paper Number: SPE-224608-MS
... Abstract This paper describes leak detection and analysis in complex reservoirs and challenging environments in a green field "S" using multiple diagnostic tools. Most of the wells are laterals with Inflow Control Devices (ICDs) and swell packers in lower completions across heterogeneous...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, April 21–23, 2025
Paper Number: SPE-224679-MS
... viability, making them more attractive in the shift towards sustainable energy systems. This paper examines techniques to maximize flow rates in geothermal gravel-pack completions, especially in unconsolidated sandstones, to enhance the rentability of low-enthalpy geothermal projects. Gravel-pack...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, April 21–23, 2025
Paper Number: SPE-224779-MS
... Abstract Multilateral well construction and completion has been a cornerstone of sustainable field development in the Middle East. It has played vital role in the production performance and extend well life while minimizing environmental impact. Furthermore, the recent advancement...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, April 21–23, 2025
Paper Number: SPE-224805-MS
... Figure 1 Comparison of Various Completion Alternatives Figure 2 Completion Decision Matrix Abstract A 9-zone all-electric multi-zone intelligent completion was planned to be installed in an onshore well in Mozambique, in order to target multiple isolated stacked under...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, May 7–9, 2024
Paper Number: SPE-219116-MS
... parameters. These included different phases of the well such as drilling and completion, processed openhole logs, perforation details, fracturing treatment parameters, and pressure diagnostics data. A detailed diagnostic study was then conducted to dissect and diagnose the factors that were affecting...
Proceedings Papers
Rohit Agarwal, Nooruldeen Zeyad Essmat, Jesus Levario, Sarvodaya Bansal, Mauricio Corona, Ahmed Alismail, Mustafa Almuallim, Daniel Paz
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, May 7–9, 2024
Paper Number: SPE-219238-MS
... Abstract Deployment of Open Hole Multistage Fracturing (OH MSF) completion system in long horizontal wells has always been a daunting task, and often presents high risk of getting stuck in open hole due to complex completion design with very stiff assemblies that include multiple large OD...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, May 7–9, 2024
Paper Number: SPE-219294-MS
... on a trial in the Minagish field to install Glass Reinforced Epoxy (GRE) lined tubing for ESP completion in a candidate well having increasing WC, CO 2 , and H 2 S. The installation was done in 1 well, and the well has been producing without any issues for more than 2 years, thereby increasing the Mean-Time...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, May 7–9, 2024
Paper Number: SPE-219153-MS
... in this well. The application used in the well was a combination of open hole multi-stage completion and suitable acid fracturing design in 2313 ft of lateral. The open-hole Multi-Stage Fracturing (MSF) completion system consists of a toe sleeve, ball drop sleeves, and high-performance open-hole packers...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, May 7–9, 2024
Paper Number: SPE-219188-MS
... or implement a smart lower completion. The study leads to lower completion with inflow control devices being the best option. As a part of the data requirements surveillance logs were acquired but not in full (production logging could not be conducted due accessibility issues), hence, the actual distribution...
Proceedings Papers
Lotfi Ibrahim Abou Elmaati, Ayman Salama Salama, Mohamed Elguoshey Ahmed, Ahmed Hamdy Mohamed, Abdelaziz Farouk Abdelaziz, Mohamed Farouk Saloma, Antar Moustafa Mohamed, Amr Atef Shehata, Mohamed Reda Ahmed, Mohamed Helmy Abdelaziz, Ahmed Hassan Ahmed
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, May 7–9, 2024
Paper Number: SPE-219345-MS
... and provided valuable observations and conclusions. Urgent repairs were completed to address cracks in the rig’s legs, ensuring compliance with ABS standards and setting the stage for further progress ( 10 ), ( 11 ) . The relocation of the rig to Al Tor Bay in the Gulf of Suez was a critical step...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the GOTECH, May 7–9, 2024
Paper Number: SPE-219367-MS
... intervention operations, completions, infill drilling and lateral creation systems. This paper will focus on how the latest multilateral technology options enable operators in the Middle East to consistently meet challenges and maximize asset value. Wells originally planned as a single wellbore or a simple...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Gas & Oil Technology Showcase and Conference, March 13–15, 2023
Paper Number: SPE-214220-MS
... Optical Downhole Temperature Sensors (DTS) and Inflow Chemical Tracers (ICT) placed on the completion. Each technology utilises different physics and has unique implementation requirements. The optimum monitoring technology is selected at the well planning stage with considerations to well design...
Proceedings Papers
Alaa Fadel Shbair, Almaz Sagdiev, Yasser Hazem Abolhag, Ahmed Mohammed Fawzy, Noor Nasriq Bin Ujal, Ibrahim Abdelgaffar Seddik, Firdaus Bin Mohamed Noordin, Olivier Pierre Pippi, Alfredo Eduardo Freitis, Mariam Suliman Alhammadi, Luis Felipe Alcantara, Abdulrahman Ali Alsoufi, Ayman Hamouda
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Gas & Oil Technology Showcase and Conference, March 13–15, 2023
Paper Number: SPE-214267-MS
... included the reservoir modelling, selection criteria. Simulation modelling evaluated prospective performance in terms of oil sweep and cumulative production and effective well length range. The completion design assessment called for limited entry liner (LEL) completions to assure effective acid...
Proceedings Papers
Gas Lift Application for Oil Wells with Heavy Crude, Thirty Years of Operation Offshore Gulf of Suez
Mahmoud Ismail Korish, Mahmoud Attia Elwan, Hisham Elsaied Mousa, Eman Said Shahin, Mohamed Elsayed Ibrahim
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Gas & Oil Technology Showcase and Conference, March 13–15, 2023
Paper Number: SPE-214009-MS
... suez valve offshore application application operation offshore gulf completion asphaltene Field Introduction The subject Field is located offshore Gulf of Suez, east of Giant Morgan Field. The field started production in 1986 from two main reservoirs ASL & Kareem where both reservoirs...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Gas & Oil Technology Showcase and Conference, October 21–23, 2019
Paper Number: SPE-198572-MS
... formation. The repair costs from corrosion attacks are very high and associated failures have effects on plant production rates and process integrity. To overcome this existing problem in upstream, nonmetallic composite materials were introduced for drilling, tubular and completions in high risk, corrosive...
Proceedings Papers
Ameera Harrasi, Maria Jimenez-Chavez, Ali Al-Jumah, Asma Barwani, Ali Lawati, Atiya Sabahi, Gerardo Urdaneta, Melih Gokmen, Khalfan Harthy, Hamood Busaidi, Faisal Saadi, Yaqoob Abri, Mahmood Harthi, Said Rahbi, Ibrahim Abri, Majid Siyabi, Huda Hooti
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Gas & Oil Technology Showcase and Conference, October 21–23, 2019
Paper Number: SPE-198554-MS
... devices installed with the sand face completion, which react in real time to the properties of the flowing fluids, decreasing/delaying the water influx (or gas if it would be the case) from high productivity zones, promoting increased oil production from other compartments of the formation, therefore...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Gas & Oil Technology Showcase and Conference, October 21–23, 2019
Paper Number: SPE-198577-MS
... the development challenges from Geology, Petrophysics, Reservoir Engineering and Well Completion in a detailed manner with a clear path towards full exploitation of the reservoir. The authors trust their experience and approaches used are practices worth replicating and are captured in this paper. Reservoir...
1