1-4 of 4
Keywords: transformer
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50586-MS
... indicated problems associated with transformer overheating due to the high frequency current harmonics generated by the PWM controllers when connected to long lengths of cable[l]. Also, at the time of selecting the M-11 VSC, a number of problems were being experienced witi capacitor failures in the Variable...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 22–25, 1984
Paper Number: SPE-12970-MS
... and Helder fields containing sections of reservoirs with permeabilities greater than 6,000 md. P. 107 pump unit completion equipment completion installation and operations helm cable connector platform mudline packer transformer connector helder reservoir surveillance water cut electric...
Proceedings Papers

Paper presented at the European Offshore Technology Conference and Exhibition, October 21–24, 1980
Paper Number: SPE-190-1980-MS
... penetrator transformer production monitoring insulation induction regulator cable hanger reliability installation production control Upstream Oil & Gas pressure sensor water cut packer earth fault electric submersible pump operator EUR 190 ARTIFICIAL LIFT BY ELECTRIC SUBMERSIBLE PUMPS...
Proceedings Papers

Paper presented at the European Offshore Technology Conference and Exhibition, October 21–24, 1980
Paper Number: SPE-241-1980-MS
... control equipment. 2.2 On the mezzanine floor the high and low voltage switchgear was installed, along with the main transformers, synchronising panel and battery charger and batteries for the switchgear tripping and closing circuits. 2.3 For layout see Appendix 11.2 3.0 EQUIPMENT RATINGS...

Product(s) added to cart

Close Modal