1-20 of 23
Keywords: gauge
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Europec featured at 79th EAGE Conference and Exhibition, June 12–15, 2017
Paper Number: SPE-185785-MS
... activity application enhanced recovery bottom hole pressure oxygen content microbial method Efficiency operation nutrient concentrate nutrient injection gauge Microbiology wellbore perforation injection water drillstem/well testing Back Production injectivity test reservoir Injection...
Proceedings Papers

Paper presented at the SPE Europec featured at 78th EAGE Conference and Exhibition, May 30–June 2, 2016
Paper Number: SPE-180159-MS
... and build-up pressure for production performance monitoring and well testing applications from the continuously available fluid level data. Comparisons with pressure data from downhole gauges show a very good agreement. The new approach of obtaining bottomhole flowing and build-up pressure data from...
Proceedings Papers

Paper presented at the EUROPEC 2015, June 1–4, 2015
Paper Number: SPE-174331-MS
... fields. Drillstem Testing information Upstream Oil & Gas pay zone fpwd result pretest Reservoir Management application drillstem/well testing reservoir pressure pressure measurement Probe real time system drawdown stationary time gauge society of petroleum engineers depletion...
Proceedings Papers

Paper presented at the EAGE Annual Conference & Exhibition incorporating SPE Europec, June 10–13, 2013
Paper Number: SPE-164854-MS
... optical pressure gauge that can be used in conjunction with the existing auxiliary pressure gauge. The new approach requires the measurement of frictional pressure drop across the flowmeter which was positioned horizontally in this work, although the method is applicable to general case with any...
Proceedings Papers

Paper presented at the SPE EUROPEC/EAGE Annual Conference and Exhibition, June 14–17, 2010
Paper Number: SPE-129616-MS
... Abstract It has historically been difficult to permanently monitor steam flood operations and also HPHT wells as the gauges available have short life spans and also give erroneous results. This project demonstrates a new, unique, robust, and available technology which...
Proceedings Papers

Paper presented at the EUROPEC/EAGE Conference and Exhibition, June 11–14, 2007
Paper Number: SPE-107268-MS
... Abstract This paper probes the gauge placement issue with regard to yielding quality formation parameters, unaffected by wellbore effects. Non-physical or biased results may result if the wellbore effects go unaccounted for. We used a wellbore/reservoir simulator, which conserves mass...
Proceedings Papers

Paper presented at the EUROPEC/EAGE Conference and Exhibition, June 11–14, 2007
Paper Number: SPE-107521-MS
... through an improved and more accurate well performance. These are achieved through analyzing the long term, real time, dynamic transient pressure obtained from Permanent Down-hole Gauges (PDG), which will provide input and vital information for improving the existing reservoir model for flow simulation...
Proceedings Papers

Paper presented at the SPE Europec/EAGE Annual Conference, June 13–16, 2005
Paper Number: SPE-94128-MS
... injectivity injection rate spe 94128 natural gas production control platform feasibility study injection facility co 2 orc project van der meer gas reservoir injection permeability test 1 upstream oil & gas gauge drillstem/well testing drillstem testing compartment reservoir...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 29–31, 2002
Paper Number: SPE-78279-MS
... Abstract A new quartz electronic memory gauge that has been introduced to the oil industry will be presented in this paper. This gauge can record data with more precision than existing gauges, and thus, can establish more accurate flowing and shut-in pressure with higher resolution. In addition...
Proceedings Papers

Paper presented at the SPE European Petroleum Conference, October 24–25, 2000
Paper Number: SPE-65152-MS
... production monitoring gauge log analysis pressure transient analysis resolution well logging reservoir characterization advanced sensor infrastructure Introduction Continuous, reliable, real-time information about reservoir performance is an essential component for optimization of production...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50672-MS
... Abstract The installation of permanent downhole pressure gauges as part of the Arkwright subsea development, was seen as the ideal solution to control escalating development costs and to satisfy reservoir performance monitoring needs. However, the failure of all nine pressure gauges, during...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50670-MS
... with alternate methods of rate measurement. flowrate multiphase downhole flowrate upstream oil & gas production control differential surface testing pressure differential water production information water holdup gauge spe 50670 lt 2 flow regime nozzle permanent system history...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 21–24, 1990
Paper Number: SPE-20963-MS
.... derivative response boundary horizontal section lower boundary skin factor thickness drillstem testing vertical permeability pressure response flow regime pressure derivative upstream oil & gas drillstem/well testing operation permeability coiled tubing gauge geologist fluid dynamics...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 21–24, 1990
Paper Number: SPE-20924-MS
... gauge wustrow sandstone sandstone type curve interpretation langenhoern zl westerholz zl upstream oil & gas interference horner plot interference test early reservoir simulation help drillstem/well testing united kingdom government geologist sedimentary rock clastic rock reservoir...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 21–24, 1990
Paper Number: SPE-20978-MS
... hole pressure gauges have continued to function throughout the year a very large amount of daily pressure data has been collected. This has been used to modify and update the full field simulation model of the fields. The reservoirs have been shown to be much less affected by intra-field faulting than...

Product(s) added to cart

Close Modal