1-20 of 49
Keywords: assembly
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Europec featured at 78th EAGE Conference and Exhibition, May 30–June 2, 2016
Paper Number: SPE-180092-MS
... two times the vertical depth. The ERD ratio [MD to true vertical depth (TVD)] was 2.21. This success resulted from a combination of drill bit selection, bottomhole assembly (BHA) stabilisation optimisation, rotary steerable drilling system usage, and close cooperation between the operating company...
Proceedings Papers

Paper presented at the SPE EUROPEC/EAGE Annual Conference and Exhibition, May 23–26, 2011
Paper Number: SPE-140913-MS
... inner barrel core sample adjustable bent housing sub housing sub outer barrel core bit inner core tube drilling operation bent angle assembly continuous directional rotary speed Introduction The deep sea drilling vessel ( D/V ) Chikyu ( Figure 1) was completed in 2005 and measures...
Proceedings Papers

Paper presented at the SPE EUROPEC/EAGE Annual Conference and Exhibition, May 23–26, 2011
Paper Number: SPE-141285-MS
.... Before the 12.25-in. hole section was completed, shales packed off the drillstring and part of the bottomhole assembly (BHA) was left in the hole. The MELES was no longer a contingency, but would now be required in the casing design to reach the target evaluation depth with a sufficient hole size of 6.0...
Proceedings Papers

Paper presented at the Europec/EAGE Conference and Exhibition, June 9–12, 2008
Paper Number: SPE-113539-MS
... or mechanically by means of wireline or coiled tubing manipulation. This system is however more mechanically complicated. Pre-drilling of the reservoir section and its preparation for the drill-in screen assembly should be thorough. The aim is to install the screen assembly without having to utilize the drill...
Proceedings Papers

Paper presented at the EUROPEC/EAGE Conference and Exhibition, June 11–14, 2007
Paper Number: SPE-107117-MS
... monitoring and control technologies are critical to intelligent well development. Completion Installation and Operations gas injection artificial lift system completion solution intelligent completion requirement reservoir Upstream Oil & Gas flow control valve assembly natural gas lift...
Proceedings Papers

Paper presented at the SPE Europec/EAGE Annual Conference and Exhibition, June 12–15, 2006
Paper Number: SPE-100234-MS
...-hole dst rig regulation formation testing openhole dst assembly society of petroleum engineers wireline-formation testing society dst application Introduction Testing of prospective formations is frequently applied in exploration wells. In some countries DST or Production test...
Proceedings Papers

Paper presented at the SPE Europec/EAGE Annual Conference and Exhibition, June 12–15, 2006
Paper Number: SPE-100220-MS
... than the old fashioned toxic API-modified compounds. piping design Upstream Oil & Gas benchmarking piping simulation performance indicator thread compound composition assembly tightness testing particle pipe coupling environmentally friendly thread compound test method workover...
Proceedings Papers

Paper presented at the SPE Europec/EAGE Annual Conference, June 13–16, 2005
Paper Number: SPE-92777-MS
.... Integrate new and existing technologies to create a fresh approach to provide economic solutions for both sand control and stimulation of the well. stimulation vessel coiled tubing spe 92777 morrison vent-screen assembly upstream oil & gas completion strategy assembly modeling...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 29–31, 2002
Paper Number: SPE-78271-MS
... sand control spe 78271 completion monitoring systems/intelligent wells beta-wave zonal isolation application assembly flow control equipment installation campos basin Introduction Well designs for subsea field developments in water depths of 2000+ meters have unique requirements. Nearly...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 29–31, 2002
Paper Number: SPE-78312-MS
... Perforated mandrel; The rubber core is attached to the perforated mandrel. The main purpose of the perforated mandrel is to provide axial strength of the assembly. End connections; are welded to the mandrel and in one end contains a set screw assembly to attach the packer to the blank pipe...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 29–31, 2002
Paper Number: SPE-78316-MS
... important to eliminating risk associated with pumping these treatments. An example is presented to illustrate how this system can be used to treat a long production interval with high laminated sands. service tool extension pack system assembly port operation spe 78316 sand control gravel...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50578-MS
.... 111 circulation sidetrack whipstock anchor anchor coiled tubing assembly seawater slim-hole sidetrack cut cost upstream oil & gas drilling operation engineer mud motor information bha whipstock spe 50578 packer perforation liner I Society of Petroleum ~neers I SPE...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50678-MS
... drill pipe mechanism valve completion equipment pressure test civ completion installation and operations inner string assembly requirement drilling operation SPE 50678 Breakthrough GiiB6u m . . Societyof PetroleumEngineers Well Suspension Operations in West of Shetland Horizontal Wells G...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50652-MS
... installation and operations service tool hydraulic fracturing shunt tube placement simulator sand control assembly wellbore gravel pack filter cake frac-pack treatment Copyright 1998, Society of Petroleum Engineers Inc. This paper was prepared for presentation at the 1998 SPE European Petroleum...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 20–22, 1998
Paper Number: SPE-50588-MS
..., that allows long intervals to be perforated in wells with complicated well trajectories plug platform innovative live well completion installation and operations history spe 50588 live well assembly heigre spe 50588 valve procedure connector permeability hydraulic workover unit workover...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 22–24, 1996
Paper Number: SPE-36888-MS
... material perforation injectivity packer pinpoint injection packer injectivity test valve preflush injection packer upstream oil & gas nigeria assembly completion installation and operations scon lower packer element packer element port scon treatment procedure consolidation technique...
Proceedings Papers

Paper presented at the European Petroleum Conference, October 22–24, 1996
Paper Number: SPE-36908-MS
... spe 36908 completion installation and operations straddle mandrel arbroath platform assembly upstream oil & gas repair option gas lift completion nipple workover platform lower packer gas lift criteria coil gas injection pressure test zonal isolation well integrity...

Product(s) added to cart

Close Modal