Regnar is a small marginal field located some 13 km from the main Dan F complex and is the first subsea completion in Danish waters, operated by Maersk Olie og Gas AS. A short lifetime has been predicted for the field which therefore has been developed as a low cost project, using a combination of subsea technology and minimum topside facilities.

Regnar consists of a subsea x-mas tree producing through a 6" pipeline with a 2 1/2" chemical piggyback line to Dan F. The x-mas tree and the subsea choke valve are controlled from a buoy moored nearby the well. The buoy is radio linked to Dan F.

The Regnar field was brought on stream on September 26, 1993.