The new generation of heavy lift vessels has stimulated the design of offshore platform topsides using modules up to 7000 metric tons (or more). These very large modules will reduce the cost of offshore hook-up. However, the hook-up cost reduction may not be as great as expected and other costs should be offset against these savings.

You can access this article if you purchase or spend a download.