1-3 of 3
Keywords: bond log
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Eastern Regional Meeting, October 11–13, 2006
Paper Number: SPE-104576-MS
..., and the trailing spacer was a filtrate-reduction solution that also enhances cement adhesion to pipe and formation. Approximately five days following the completion of both cement jobs, cement bond logs (CBL) were run on the wells and the results of each were compared. As evidenced by the comparative analysis...
Proceedings Papers

Paper presented at the SPE Eastern Regional Meeting, November 12–14, 1986
Paper Number: SPE-15918-MS
... procedures. Individual well case histories are given to show some of the situational considerations. sk class packer tool society of petroleum engineers casing and cementing dolomite circulation special cement total depth annular pressure drilling bond log cacl trenton black river...
Proceedings Papers

Paper presented at the SPE Eastern Regional Meeting, November 9–11, 1983
Paper Number: SPE-12318-MS
... ultralightweight foam-cementing systems, will be presented along with the job design used on these wells. Bond logging of the foam-cemented wells creates an array of special problems for the logging companies, due to the ultra-low densities and the high porosities of these special cementing systems. Newly...

Product(s) added to cart

Close Modal