New completion techniques improving recovery, production rates and reducing cost and complexity are always looked for in the oil and gas industry. This paper is presenting a new concept where 100's of small level 5 laterals can be drilled simultaneously into the formation around a main wellbore. This paper presents the main concept as well as some preliminary results from qualifying the system for service in a high porosity very weak chalk reservoir. The qualification of the system is addressing three main aspects, the ability to jet a 12 meter long and 5–10mm diameter lateral, the ability to produce in high porosity weak chalk without loss of production, and simulation of production that is at least as good as or better than existing technologies like propped fractured horizontal wells, acid fractured horizontal wells and different types of openhole completions with and without liners. The experiments indicate that the system is able to achieve the results we are looking for.

You can access this article if you purchase or spend a download.