1-5 of 5
Keywords: allocation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Digital Energy Conference, March 5–7, 2013
Paper Number: SPE-163731-MS
... programs. Following successful proof of concept and field trials, we will package this capability and deploy it globally as a standard workflow as soon as possible. Data-driven virtual flow meters are being implemented to provide a 3-phase metering capability. Better well and zonal flow allocation...
Proceedings Papers

Paper presented at the SPE Digital Energy Conference, March 5–7, 2013
Paper Number: SPE-163705-MS
... measurements collected in the field are processed to produce allocated production volumes at each well and zone. Consumed by different departments across the company, the allocated volumes are used for planning, forecasting, operations management, revenue accounting, marketing, regulatory and partner reporting...
Proceedings Papers

Paper presented at the SPE Digital Energy Conference and Exhibition, April 19–21, 2011
Paper Number: SPE-144195-MS
... Complex field in Offshore Equatorial Guinea. Two main challenges in this field include continuously allocating gaslift in frequently changing field conditions while minimizing production losses as well as understanding and maximizing the field production plateau. A commercial tool was used to demonstrate...
Proceedings Papers

Paper presented at the SPE Digital Energy Conference and Exhibition, April 19–21, 2011
Paper Number: SPE-144259-MS
... Abstract Knowing the exact flow allocation for each controlled zone is important for well optimization and the management of an intelligent well system (IWS). For two-zone IWS producers, a broadly accepted downhole gauge configuration uses the triple-gauge system, where two gauges give...
Proceedings Papers

Paper presented at the SPE Digital Energy Conference and Exhibition, April 19–21, 2011
Paper Number: SPE-144197-MS
.... Although the approach is not new in the petrochemical industry, the application is ‘young’ in the upstream. Project benefits included less downtime due to well testing and early problem detection, 65% less time expended on validating well tests and allocating individual well rates, and improved cost...

Product(s) added to cart

Close Modal