1-6 of 6
Keywords: rig
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Deep Drilling and Production Symposium, April 1–3, 1984
Paper Number: SPE-12611-MS
... return to profitability or at least a positive cash flow. consumption drilling contractor oil price surplus inventory profitability united states total well cost efficiency footage contractor cash flow rig spe 12611 drilling operation management upstream oil & gas well cost...
Proceedings Papers

Paper presented at the SPE Deep Drilling and Production Symposium, April 17–19, 1977
Paper Number: SPE-6438-MS
... Abstract America's energy outlook is an everchanging thing; however, with the construction of Rig 76 Delta Drilling Company is declaring its faith in the future of ultra-deep drilling in this country. In addition to design criteria and specifications, this paper discusses unique problems...
Proceedings Papers

Paper presented at the SPE Deep Drilling and Production Symposium, September 8–10, 1974
Paper Number: SPE-5167-MS
... for over-all supervision of drilling operations. Improved working conditions and remuneration are needed to attract and keep rig personnel and line supervision in the field. personnel and line supervision in the field. A complete revision of management philosophy of personnel utilization is mandatory...
Proceedings Papers

Paper presented at the SPE Deep Drilling and Development Symposium, March 28, 1968
Paper Number: SPE-2076-MS
... and procedures, and reduced volume of drilling. References at end of paper. The main reason for the present plight of the West Texas contractor is an over-supply of rigs, along with a continual decrease in drilling. During the period of the Snyder and Spraberry booms, many people were able to go...
Proceedings Papers

Paper presented at the SPE Deep Drilling and Development Symposium, March 31, 1966
Paper Number: SPE-1397-MS
... Abstract The drilling contractors of the Permian Basin have been hard-pressed to meet the demand for 20,000-ft drilling rigs since the discovery of the prolific gas reservoirs in the deep Delaware Basin. The demand came at a time when the contractors of the area had felt the economic squeeze...

Product(s) added to cart

Close Modal