Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-17 of 17
Keywords: rig time
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Ross Lowdon, Michael Breen, Michael Mouyiasis, Michael Edmunds, Konstantin Bulychenkov, Katerina Brovko
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 5–7, 2019
Paper Number: SPE-194057-MS
... to the directional driller from reduced pump cycles. Directional surveying is generally seen as a must have on a rig, however the associated rig time is considerable. This unique and world first method will discuss how continuous six axis survey are made, the accuracy modelled and so how the industry can eliminate...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184662-MS
... circulation stage-cementing tool wellbore integrity international association of drilling contractors packer society of petroleum engineers packoff stage-cementing equipment provide casing and cementing packer element rig time integrity Introduction Casing-by-casing annular (CCA) gas...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184620-MS
... or inaccurate tortuosity. TVD assurance utilizing the high-definition survey technology has been used with several new approaches, for example, to reduce rig time on surveys by increasing the interval between stationary surveys without degradation in positional certainty. This technology also helps...
Proceedings Papers
Franck Michel, Ben Robbins, Steven Kizziar, Nasreddine Laroussi, Michael Ehiwario, Rivers Fike, Jonathan Garrett, George A. Fuller, Glenn Donovan
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184604-MS
... for conventional wireline-conveyed CBL tools. Many operators now use logging-while-drilling (LWD) sonic sensors for compressional and shear data acquisition in openhole environments. Using the same sonic systems, with minimal additional rig time, logging data acquired through the casing/liner strings while...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184645-MS
... in a challanging formation. Placing the reamer close to the bit removed the need for an additional rathole elimination run, avoiding the risks associated with it and saving rig time. The on-command digital, expandable under reamer is fully integrated into the bottom hole assembly (BHA) and can be monitored...
Proceedings Papers
Yaou Wang, Marco Vos, Alireza Karimpour, Murray Fearn, Hendri den Besten, Tomasz Stanko, Jim Bain, Yuelin Shen, David Stokes, Ali Issa, Zafar Khan
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178866-MS
... operation saved the operator more than 49 h of rig time in abandoning the well. The successful application demonstrated the capability of not only the single-trip BHA, but also the calibrated dynamic simulation which saved substantial rig time and delivered a reliable single-trip service. The the successful...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178829-MS
... reaming and saving rig time for a shoulder test that is otherwise required. The technology proved its effectiveness as a reliable main reamer as well as a near bit reamer for rat hole elimination while satisfying all requirements for directional drilling and enabling Measurement While Drilling (MWD...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178863-MS
... Exhibition data transmission Reamer downlink drilling performance reservoir section rig time WDP telemetry telemetry reduction Martin Linge field The Martin Linge field is situated offshore in the Norwegian sector of the North Sea, about 42 kilometers west of Oseberg and close to the border...
Proceedings Papers
Bill Fisher, William T. Daugherty, Serko Sarian, Jim Tucker, Dacey McManus, Chris Babin, Joseph Varkey, Issa Al Dalhami
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178890-MS
... unavoidable fishing incidents, saving more than 12 deepwater fishing days and USD 9 million of rig time. In 2015 Gulf of Mexico fishing incidents have dropped to a record low 0.4% of total descents. fishing operation breakage torque Upstream Oil & Gas strand rig time well logging breaking...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 4–6, 2014
Paper Number: SPE-167965-MS
... and safer ways of addressing well challenges. Certainly, narrow pressure windows, long stepouts, deepwater environments, and other challenges that are common to today's industry vocabulary create increased drilling risk. Other factors, including the high cost of rig time and the increasing sophistication...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference, March 5–7, 2013
Paper Number: SPE-163410-MS
... Abstract Reducing rig time and material costs for offshore wells is critical to a project's financial profitability. With the dramatic increase in the number of deepwater wells, new technologies and methods are needed to quickly and reliably complete wells. A case history of five deepwater...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 1–3, 2011
Paper Number: SPE-140277-MS
... that gathered information at the section mill and sent the data back to surface in real-time for on-site evaluation by engineers. These two technologies significantly reduced rig time due to the longer lasting cutters as well as the real-time data transmitted back to surface from the downhole optimization sub...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference, February 23–25, 2005
Paper Number: SPE-92596-MS
... completion method eliminates gravel packing and minimizes intervention in completion operations, saving substantial rig time. It also simplifies operation logistics, especially in remote or offshore environments. This paper describes initial field test results of the new system, cost comparisons...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference, March 9–11, 1999
Paper Number: SPE-52813-MS
... rig time. As in any displacement exercise, the synthetic-base fluid will not be totally removed as some residue will remain on the wellbore wall. When the bentonite in the conventional water-base fluid systems came in contact with the residual calcium chloride (CaCl 2 ) from the remaining...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference, February 27–March 2, 1990
Paper Number: SPE-19925-MS
... to undertake dangerous and heavy work high above the rig floor in order to couple the flow hose to the swage. The economics are attractive from the standpoint of rig time savings even with the use of the tool as a means to fill casing as it is run into the well. The average reduction in rig time while...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IADC Drilling Conference, March 5–8, 1985
Paper Number: SPE-13487-MS
... assembly mwd survey platform upstream oil & gas azimuth rig time production liner drilling operation gamma ray torque singleshot survey log analysis bfc multishot survey cerveza platform application inclination mwd measurement well logging resistivity single shot survey wireline log...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the IADC/SPE Drilling Conference, February 20–23, 1983
Paper Number: SPE-11423-MS
... turnkey drilling fluid management & disposal liability contract drilling fluids and materials incentive drilling contract rig time upstream oil & gas operator operator operator log analysis eqpt drilling equipment implied drilling operation united states government casing crew...